EG MALL NSC ( 21 MARCH 2025)
6th floor. Genset equipment room. Setting out brick wall and Genset installation.
6th floor. MSB room. Brick for screeding works. @~WY tolong cek itu sprinkler. 👏
Site progress photo.
21/3/2025
Tower A.
Tower A. 
21st floor. Plastering and screeding.
Mall. 7M. Slab rebar and M&E
Tower B. 
15th floor slab/wall panel in progress.
14th floor. Cast.
14th floor. Slab panel and rebar.
Tower B. 15th floor
Tower B. 14th floor. Cast
Tower B. 9th floor. Mockup unit.
aklimat melantik penyelaras keselamatan dan kesihatan pekerjaan. 10am.