Wednesday, November 30, 2022

01 DEC 22 HKL

SITE GROUP

Azman HKL: Site progress. 1/12/2022

Azman HKL: 3rd floor slab conduit inprogress

Azman HKL: Column work inprogress.

Azman HKL: Basement watertank. column and wall rebar inprogress
Azman HKL: Pile cap area








 

01 DEC 22













 

Tuesday, November 29, 2022

30 NOV 22 HKL

SITE GROUP
Azman HKL: Site progress. 30/11/2022 3rd floor column in progress

Azman HKL: Socket installation in column

Azman HKL: 3rd floor slab rebar, slab formwork inprogres
Azman HKL: Rebar inprogress



Azman HKL: Basement watertank. Column rebar, wall rebar, earthing cable work, plinth inprogress.

Azman HKL: Socket in Column I/5

Azman HKL: Gl: F-I/8-10. Bottom rebar inprogres. Conduit installation inprogress.









NSC GROUP
Azman HKL: F/5, done installation and got approval from consultant.

videos from Raymond Chong. Y.F (HKL P. Manager)





 

30 NOV 22














 

Monday, November 28, 2022

29 NOV 22 HKL

SITE GROUP
Azman HKL: Site progress, 29/11/2022. 3rd floor column inprogress
Azman HKL: Morning.. NSCs, 3rd floor. Tolong cek drawing column services. Formwork tutup hari ini.👆

Azman HKL: 3rd floor


Azman HKL: 3rd floor slab and rebar

Azman HKL: Basement water tank. Column inprogress

Azman HKL: Pile cap area

Azman HKL: Escalator opening.

Azman HKL: Technical meeting. M&E services at basement

NSC GROUP
Azman HKL:  I/6

Azman HKL:  G/6

Azman HKL:  Slab

Azman HKL:  HKL, Econmech, KH, DCC, consultant PIC.





 

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...