SITE GROUP
Azman HKL: Site progress. 30/11/2022 3rd floor column in progress
Azman HKL: Socket installation in column
Azman HKL: 3rd floor slab rebar, slab formwork inprogres
Azman HKL: Rebar inprogress
Azman HKL: Basement watertank. Column rebar, wall rebar, earthing cable work, plinth inprogress.
Azman HKL: Socket in Column I/5
Azman HKL: Gl: F-I/8-10. Bottom rebar inprogres. Conduit installation inprogress.
NSC GROUP
Azman HKL: F/5, done installation and got approval from consultant.
videos from Raymond Chong. Y.F (HKL P. Manager)