Wednesday, November 30, 2022

01 DEC 22 HKL

SITE GROUP

Azman HKL: Site progress. 1/12/2022

Azman HKL: 3rd floor slab conduit inprogress

Azman HKL: Column work inprogress.

Azman HKL: Basement watertank. column and wall rebar inprogress
Azman HKL: Pile cap area








 

No comments:

Post a Comment

  EGMALL COORDINATION (6 18th floor. Tower B. Installation. ELV, Electrical, ACMV, FF drain pipe services done installation. 18th floor. Tow...