29 NOV 22 HKL

SITE GROUP
Azman HKL: Site progress, 29/11/2022. 3rd floor column inprogress
Azman HKL: Morning.. NSCs, 3rd floor. Tolong cek drawing column services. Formwork tutup hari ini.👆

Azman HKL: 3rd floor


Azman HKL: 3rd floor slab and rebar

Azman HKL: Basement water tank. Column inprogress

Azman HKL: Pile cap area

Azman HKL: Escalator opening.

Azman HKL: Technical meeting. M&E services at basement

NSC GROUP
Azman HKL:  I/6

Azman HKL:  G/6

Azman HKL:  Slab

Azman HKL:  HKL, Econmech, KH, DCC, consultant PIC.





 