Friday, December 9, 2022
10 DEC 22 HKL
SITE GROUP
Kadapi : Updated progress at level 4.
NSC GROUP
Lo. W. H (HKL-Site Engineer): @Edwin 013 @Joseph Wong KH
Lo. W. H (HKL-Site Engineer): please be ready your piping
Joseph Wong: noted
Raymond Chong Y.F (HKL P.Manager): @Edwin 013 👆please install pipe sleeves at Water Tank RC Wall
Raymond Chong Y.F (HKL P.Manager): Bottom bar in progress
Thursday, December 8, 2022
09 DEC 22 HKL
SITE GROUP
photos sent by 012-8433877
NSC GROUP
Azman HKL: Site progress. 9/12/2022
4th floor. Slab formwork & beam rebar inprogress
Azman HKL: 3rd floor column inprogress
Azman HKL: Basement watertank area done casting
Azman HKL: Pile cap area, earthwork inprogress
Azman HKL: Zone 2 area. Earthwork inprogress.
Azman HKL: Morning. 4th floor slab casting will postponed to 13/12/2022. Tuesday. Please be informed.
Wednesday, December 7, 2022
08 DEC 22 HKL
SITE GROUP
Azman HKL: Work progress. 8/12/2022 4th floor formwork and beam rebar inprogress
Azman HKL:Beam rebar inprogress
Azman HKL: Basement watertank. Wall inprogress
Azman HKL: Wall rebar
Azman HKL: Zone 2. Earthwork inprogress
Azman HKL: Pile cap area
Tuesday, December 6, 2022
07 DEC 22 HKL
SITE GROUP
Azman HKL: Site progress. 7/12/2022 4th floor slab formwork and beam rebar inprogress.
Azman HKL: 4th floor inprogres
Azman HKL: 3rd floor column inprogress
Azman HKL: Column inprogress.
Azman HKL: Socket box at column installed.
Azman HKL: Zone 2 earthwork inprogress
Azman HKL: Earthwork.
Azman HKL: Basement water tank wall inprogress..
Azman HKL: Pile cap area
Azman HKL: Watertank area