07 DEC 22 HKL

SITE GROUP
Azman HKL: Site progress. 7/12/2022 4th floor slab formwork and beam rebar inprogress.
Azman HKL: 4th floor inprogres

Azman HKL: 3rd floor column inprogress
Azman HKL: Column inprogress.

Azman HKL: Socket box at column installed.

Azman HKL: Zone 2 earthwork inprogress
Azman HKL: Earthwork.

Azman HKL: Basement water tank wall inprogress..
Azman HKL: Pile cap area

Azman HKL: Watertank area



 