EG MALL NSC ( 13 MAY 2025)
AZMAN: 7th floor. Please be inform. Brick layout will start. Any material, equipment at the area, please relocate.
Refer the brick layout area. Thanks.
RAY CHONG: Dear all, did I not inform don’t do anything at L21 before I say OK? @Azman, tolong control
RAY CHONG :This will damage the waterproofing membrane and we need to rectify and redo water ponding test, will charge whoever did thisRAY CHONG: Please cooperate and have understanding
[13/5/2025 9:30 AM] EG MALL Mr Lo: Boss tu macam orang yang buat roof pyramid bukan kah ?
[13/5/2025 9:31 AM] +60 12-559 6863: At water tank area got pyramid kah?
[13/5/2025 9:33 AM] +60 12-559 6863: Sorry, this is by JSK
[13/5/2025 10:27 AM] Azman HKL: All works at L21. Please on hold until the slab works finish. NSC site PIC, please take note and extra carefully. 👏 @~s4yamahuk4ya88.gmail.com @~WY🫨 @~zee @HIDAYA KH office Num
Site progress photo.
13/5/2025.
Tower A.
7th floor. ST9 and ST8. Staircase roofing works.
Tower B.
17th floor. Slab panel and Rebar
16th floor. Wall panel.
8th floor. Wall panel.
Tower B. 17th floor.
Tower B. 16th floor.
6th floor. Genset area. Cable tray works in progress.
RAY CHONG: Azman, suruh dorang kasi cantik ini tempat
[13/5/2025 10:37 AM] +60 12-559 6863: Tidak mau cat dulu?
[13/5/2025 10:44 AM] Azman HKL: Notes bos. Itu wall say minta NSC kasi bagus dulu.
[13/5/2025 10:52 AM] Azman HKL: @~Leppong @~s4yamahuk4ya88.gmail.com take note itu Cable Ladder. 👏. Kita bincang nanti arrangement dalam site.
[13/5/2025 10:53 AM] Azman HKL: @~WY🫨 itu wall. Kasi kemas dia macam sana office. Jangan biar lama begitu kena komen.
[13/5/2025 10:56 AM] +60 12-559 6863: hold cable tray dulu, cat dulu
Subcontractor Weekly meeting