EG MALL
Saturday, April 12, 2025
EG MALL NSC ( 9 APRIL 2025)
EG MALL NSC ( 9 APRIL 2025)
7th floor. 7M..mezanine. water tank slab cast. Plinth layout check and setup.
Tower B.
15th floor. Slab cast.
15th floor. Slab panel and rebar in progress.
14th floor. Wall panel and slab
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
EG MALL SITE DAILY ( 31 JULY 2025)
EG MALL SITE DAILY (3 MARCH 2025)
EG MALL SITE DAILY (3 MARCH 2025)
EG MALL SITE DAILY (5 MARCH 2025)
EG MALL SITE DAILY (5 MARCH 2025)
EG MALL SITE DAILY (24 APRIL 2025)
EG MALL SITE DAILY (24 APRIL 2025)
No comments:
Post a Comment