EGMALL COORDINATION(6/1/2025)
KADAPI: @HIDAYA KH office Num ada sdh air? Nanti pasir bekumpul dlm pipe.
HIDAYAH: kami cek dulu bossEGMALL COORDINATION(7/1/2025)
[7/1/2025 10:43 AM] Edwin Chen 013: Which party is carrying out work on the upper floor involving throwing water into the floor drain? This is not a good practice, as it can lead to blockages in our pipes. Cement debris stuck inside the pipe will cause serious issues and make clearing it extremely difficult.
@Azman HKL
[7/1/2025 11:00 AM] Kadapi J. PROMES: Ask ur men to investigate. Absolutely you r correct.
[7/1/2025 11:01 AM] Azman HKL: Noted. Archi subcon doing slab works. We had to inform them to stop the water flow immediately. Will take this issue seriously with the subcontractor. 🙏
[7/1/2025 11:07 AM] Edwin Chen 013: Thanks for the update. 🙏🙏