AZMAN: 13th floor. Site inspection. Floor trap from 14th to 13th floor. Please adjust pipe route as per site discussion.
AZMAN: 13th floor Room 10.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
EG MALL SITE DAILY ( 31 JULY 2025)
EG MALL NSC ( 11 MARCH 2025)
EG MALL NSC ( 11 MARCH 2025) [11/3/2025 10:26 AM] +60 16-837 8881: Belum habis naik bata tapi mahu paitong sudah ? 6th floor. Genset roo...
EGMALL COORDINATION (8/4/2025)
EGMALL COORDINATION (8/4/2025) 7M. Cooling tower, water tank. Plinth inspection. 7M. Done M&E inspection. Please proceed. @EG MALL Nasri
EG MALL NSC ( 21 MAY 2025)
EG MALL NSC ( 21 MAY 2025) Ok. Noted. Will liase with @EG MALL Mr Lo @EG MALL Nasri . Please prepare the report and submit to us. Thanks. ...