EGMALL COORDINATION(21/2/2025)
AZMAN: Tower B. 8th floor corridor.
As per site inspection with Client and consultant, Ceiling height below the pipe bracket(2625mm). Plumbing will offset 225mm from the wall. @HIDAYA KH office Num @~Johnny Chin @Kadapi J. PROMES
[21/2/2025 10:02 AM] Kadapi J. PROMES: Ya as per discussed at site. Any how, KH have to prepare opening trough r.c. beam on time above floor level. Tq
[21/2/2025 3:49 PM] +60 12-559 6863: Tower A ke Tower B ni?
[21/2/2025 3:50 PM] Kadapi J. PROMES: TOWER A
[21/2/2025 3:50 PM] +60 12-559 6863: 😁
[21/2/2025 3:50 PM] Kadapi J. PROMES: Typing error



No comments:
Post a Comment