Azmanhkl: Request for inspection. 8th floor. TP4. Tower B at 2pm. @Kadapi J. PROMES . Site supervisor please standby at site during inspection. @HIDAYA KH office Num @~zee @~WY 

8th floor. Tower B. Lightning cable inspection.
A/C drain pipe inspection.

Inspection plumbing pipe

ELV conduit inspection in progress.

[3/8/2024 2:55 PM] Azman HKL: Inspection done.  👌@Mr. Voo @EG MALL Nasri please proceed.

[3/8/2024 2:59 PM] Mr. Voo: 👍🏻