EGMALL COORDINATION(3/8/2024)
Azmanhkl: Request for inspection. 8th floor. TP4. Tower B at 2pm. @Kadapi J. PROMES . Site supervisor please standby at site during inspection. @HIDAYA KH office Num @~zee @~WY
8th floor. Tower B. Lightning cable inspection.
A/C drain pipe inspection.
Inspection plumbing pipe
ELV conduit inspection in progress.
[3/8/2024 2:55 PM] Azman HKL: Inspection done. 👌@Mr. Voo @EG MALL Nasri
please proceed.
[3/8/2024 2:59 PM] Mr. Voo: 👍🏻
No comments:
Post a Comment