EG MALL NSC (8 OGOS 2024)

  EG MALL NSC (8 OGOS 2024)

Morning.Site progress photo.8/8/24.8th floor. Tower B. Transfer plate rebar, tendons and M&E services.

7th floor. P/7. Slab formwork and rebar.

[8/8/2024 8:09 AM] EG MALL Mr Lo: @HIDAYA KH office Num ini kawasan 1st cast hari ini, ft, rwdp sudah siap kah

[8/8/2024 8:10 AM] EG MALL Mr Lo: besok terus 2nd cast

[8/8/2024 8:10 AM] HIDAYA KH office Num: sudah mr lo

[8/8/2024 8:10 AM] EG MALL Mr Lo: you ada senang nanti ambil gambar tu workdone post sini ..thanks

[8/8/2024 8:31 AM] HIDAYA KH office Num: okay2

5th floor. Z8. slab cast.
8th floor. TP9. Slab formwork and support in progress.

Pressure test. Sprinkler pipe riser. Vertical ground floor to 10th floor.

14th floor. @~ShawnChia @~s4yamahuk4ya88.gmail.com . Ini area untuk masuk MSB equipment. Minta jangan tutup bata kan. Kasi kompom ya.

[8/8/2024 9:51 AM] +60 16-837 8881: Boleh tq Asa boleh sampai lv14 dan tolak ke MSB room

[8/8/2024 9:54 AM] Azman HKL: @EG Mall Shafee @+60 16-832 2597 ini area minta tolong hold bata untuk MSB equipment masuk. 🙏🙏. 14th floor, ST5.


5th floor. Mall electrical riser. Temporary door by DCC. 


@HIDAYA KH office Num ada paip hitam nie perlu tutup keluar saja air dari sini paip basement dekat ST2

 [8/8/2024 10:00 AM] HIDAYA KH office Num: okay2 nanti kami tutup

1st floor to 5th floor. Cable ladder in progress


@Azman HKL @Mr. Voo  kami sudah buka yaa












[8/8/2024 6:06 PM] +60 12-559 6863: @Edwin Chen 013 please get ur workers to provide if not done before we start pump concrete

[8/8/2024 6:06 PM] +60 12-559 6863: Message from Mr. P’ng

[8/8/2024 6:21 PM] +60 12-559 6863: Sorry just clarify with Edwin no issue on this