EG MALL NSC(30JULY2024)

 


[30/7/2024 8:33 AM] EG MALL Mr Lo: 3/8 tuang

[30/7/2024 8:34 AM] EG MALL Mr Lo: @HIDAYA KH office Num tolong lengkapkan tu scupper kah  ft kah rwdp kah , kalau Ada

[30/7/2024 8:35 AM] HIDAYA KH office Num: done mr lo

[30/7/2024 8:36 AM] EG MALL Mr Lo: Ambil gambar workdone bila you senang

[30/7/2024 8:36 AM] EG MALL Mr Lo: Terima kasiH

[30/7/2024 8:39 AM] HIDAYA KH office Num: okay




[30/7/2024 9:49 AM] Azman HKL: To all NSC PIC, tomorrow, please join the site walk with the Survey Big Bos. Time of site walk will be informed later by tomorrow. @EG MALL ECONMECH Dart @+60 19-821 8251 @+60 19-895 9900 @HIDAYA KH office Num @+60 10-822 2014

[30/7/2024 10:09 AM] Azman HKL: Noted. @+60 14-379 2990 we prepare site inspection for sprinkler pipe before pressure test. Start with the 3rd floor. Parking area. 🙏

[30/7/2024 10:10 AM] Azman HKL: @+60 14-379 2990 kita atur ni. Sama prepare untuk pressure test Hotel dan parking area.

[30/7/2024 10:28 AM] +60 14-379 2990: @Azman HKL  Besok kita buat start level 4 okay ka?

[30/7/2024 10:29 AM] +60 19-821 8251: Morning boss @Azman HKL &@+60 12-559 6863 later 2pm meeting i gonna late to attend as got jkkp inspection need attend. Sorry about that.

[30/7/2024 10:32 AM] Azman HKL: K. Bsok tgk dia.

[30/7/2024 1:13 PM] Azman HKL: Info: meeting 2pm ya. @+60 14-379 2990 @+60 19-821 8251 @+60 16-837 8881 @HIDAYA KH office Num @+60 10-822 2014 

Petang, @Azman HKL Mau minta tolong kasih pindah ini kabel2 yg ada dalam riser. Kami mau tutup lubang.. Tq..

[30/7/2024 1:56 PM] Azman HKL: Ok. Floor brapa? Staircase?

[30/7/2024 1:59 PM] Azman HKL: Boleh gambar itu brickwall yang belum plaster. Ini floor brapa? 🙏

[30/7/2024 2:02 PM] +60 19-809 6068: Sorry2. Lvl 10-13 hotel str6

[30/7/2024 2:47 PM] Azman HKL Weekly coordination meeting.

[30/7/2024 2:51 PM] Azman HKL: Update info. site walk at 3pm.

EG Mall site daily(30/7/2024)

 EG Mall site daily(30/7/2024)














Date: 30 July 2024 (2.10pm)
Site Coordination Meeting No.7
- Hidayah

1. Site walk with EG bosses and consultant - tomorrow at 3pm
2. Plastering works - use chicken wire mesh (by HKL) for plastering works to prevent cracking. 
3. RWDP & scupper drain GF to 7th floor - install temporary piping to drain stagnant water.
4. Pressure test - submit pressure gauge certificate before the test.



EGMALL NSC(29/7/2024)

  EGMALL NSC(29/7/2024)


                          [29/7/2024 8.20 am] Azman HKL  Site progress photo. 29/7/24. 21st floor. Tower A.
            [29/7/2024 8.20 am]8th floor. Tower B. Slab rebar, tendons and M&E in progress.


                           [29/7/2024 8.20 am]7th floor. P/7. Slab rebar
4th floor. Zone 8. Slab rebar in progress.

Basement. ST5. @~WY pusing semua staircase. Ada lubang kasi pasang pipe sleeve dan tutup dia. Saya tgk staircase ni maw cat sudah.

[29/7/2024 9:05 AM] Azman HKL: @+60 11-6219 0511 itu wall kamu yang hack ka? Kalau kamu punya kasi bersih itu habuk di soffit ya. Sudah cat itu.

[29/7/2024 9:06 AM] +60 12-559 6863: Painter will move in for ST5 & ST6 painting tomorrow, please get all works patch up nicely

[29/7/2024 9:31 AM] Azman HKL: @+60 14-379 2990 @HIDAYA KH office Num 8th floor. semua bilik riser sda siapkan. Screeding boleh jalan sudah. Proceed 9th, 10th, 12th, 14th floor ya. Jalan terus...💪💪

[29/7/2024 9:32 AM] Azman HKL: Kalau ada maslah kita kasi atur sampai siap. Saya blanja kamu minum kopi O pink.. 😅

[29/7/2024 9:41 AM] +60 11-6219 0511: Ok man saya dtg check


[29/7/2024 10.05 AM] Azman HKL:4th floor. Electrical riser..@~Leppong @~s4yamahuk4ya88.gmail.com atur pasang box cepat. Sebelum cat. 

[29/7/2024 10.06 AM]Azman HKL: 4th floor. @~WY minta kasi rata. Ini macam tidak pakai sponge kasi rata. 🙏. Archi tiyau saya kalau begini.


[29/7/2024 10.06 AM] Azman HKL; Kalau macam ini cantik.

[29/7/2024 10.06 AM] Azman HKL; Timbul itu terkeluar. Minta kasi rata dia ya. Jangan bagi peluru orang bising kerja kita.

[29/7/2024 10.11 AM] Azman HKL; 4th floor. Z8. Electrical and ELV conduit in progress

[29/7/2024 10:22 AM] Azman HKL: @Azman HKL basement kasi terang terang, Rabu dorang mau tengok chiller room sama mall consultant dan big boss Servay
[29/7/2024 10:23 AM] Azman HKL: Chiller room. Temporary storage KH. Tolong atur bersih ya. Mana HKL sampah punya kasi inform saya. 🙏

[29/7/2024 10:23 AM] EG Mall shafee:@HIDAYA KH office Num tolong repair ko punya pipe… dlm mockup unit room 22…saya mau lay angle fillet….

[29/7/2024 10:29 AM] EG Mall Shafee: @HIDAYA KH office Num
[29/7/2024 10:30 AM] HIDAYA KH office Num: okay2 kami cek balik semua tu pipe
[29/7/2024 10:37 AM] +60 12-559 6863: Basement mesti mau clear by tomorrow
[29/7/2024 10:37 AM] HIDAYA KH office Num: noted
[29/7/2024 10:38 AM] +60 12-559 6863: @Azman HKL kasi terang terang hari ini, nampak banyak teruk balik kita punya basement
[29/7/2024 10:39 AM] Azman HKL: Ok.
 
Ni pipe yang bikin pipe saya rosak dan masuk air ....

[29/7/2024 11:18 AM] +60 12-559 6863: @Azman HKL;@~Leppong @~s4yamahuk4ya88.gmail.com nanti atur tempat maw pindah ni JC9C dengan Amalan. Kami bantu pindah guna Hitachi. Ini tempat maw buka untuk laluan masuk.

[29/7/2024 11:22 AM]@HIDAYA KH office Num itu extension pipe, tolong cek dia. Pastikan kukuh tidak tercabut masa tuang simen. Kalau boleh sambung paip ikat pakai dawai. Biar dia kuat ya.

:Installation PVC conduit@level 4_Mall was done
[29/7/2024 1:46 PM] +60 12-559 6863 Azman HKL:@+60 12-843 3877 boleh inspection sudah ni?
inspection jam 2pm ni..


[29/7/2024 2:23 PM] +60 12-559 6863 Azman HKL:Slab inspection in progress.
Level 4 - Staircase 6, request housekeeping...CW riser, plan mau jalan pipe VRF @Azman HKL 
[29/7/2024 3:04 PM] Azman HKL: Start dari 4th floor ka? Bagus dari ground floor naik atas. Satu kali screeding maw jalan.
[29/7/2024 3:04 PM] Azman HKL: Bila kamu maw jalan? Saya atur orang dulu tgk itu tempat ya.
[29/7/2024 3:07 PM] +60 14-379 2990: Paling ngam @Azman HKL ..minggu dpn sampai kontena 40 ft VRF pipe..
[29/7/2024 3:08 PM] Azman HKL: Ok. Noted. Kami try ini minggu.













Monday, July 29, 2024

EGMALL NSC(27/7/2024)

 EGMALL NSC(27/7/2024)


[27/7/2024 8:02 AM] Azman HKL: Site progress photo.
 [27/7/2024 8:03 AM] Azman HKL: Tower B. 8th floor. Slab rebar, tendons and M&E in progress.

[27/7/2024 8:04 AM] Azman HKL: 7th floor. Zone P/7. Slab formwork and rebar in progress.

[27/7/2024 8:17 AM] Azman HKL: External drainage work in progress.
[27/7/2024 8:40 AM] Azman HKL: 7th floor. TB6.
                                                            
[27/7/2024 8:41 AM] Azman HKL: 3rd floor. Ramp 5. Slab rebar and M&E in progress. Zone 8. Slab rebar in progress.

[27/7/2024 8:08 AM] Azman HKL: Morning. @+60 14-379 2990 nanti report ni progress slab closing pagi ya. Maw hand over bagi sama team slab screeding. 🙏.

[27/7/2024 8:12 AM] Azman HKL: @+60 12-843 3877 atur siap ni wall hari ni. Buat proper kualiti punya. 🙏. Kita tidak maw Archi reject dan HKL repair dan backcharge. 2 kali kerja. 🙏🙏.

[27/7/2024 8:56 AM] +60 14-379 2990: Plastering work in progress level 8 to level 13 @Azman HKL

[27/7/2024 9:00 AM] Azman HKL: Ok. Semua di 8th floor tu ya. Mana yang boleh tutup. Kalau ada masalah inform saya, kita cari kasi selesai dia. 🙏

[27/7/2024 9:05 AM] Azman HKL: Strong reminder untuk kita semua: Site supervisor tolong pantau kualiti kerja. Kualiti kualiti kualiti...

[27/7/2024 9:07 AM] +60 12-559 6863: 💪💪💪

[27/7/2024 11:06 AM] Azman HKL: 15th floor. @+60 12-843 3877 kasi atur terus ni lubang ya.

[27/7/2024 11:09 AM] Azman HKL: 15th floor. Riser room. Tolong plaster bilik riser room supaya boleh jalan paip. @EG Mall Shafee

[27/7/2024 11:13 AM] Azman HKL: 15th floor. Toilet wall plastering in progress.

[27/7/2024 11:23 AM] +60 12-843 3877: Level 15 opis sudah rectify

@Azman HKL

[27/7/2024 11:26 AM] Azman HKL: Lift motor room. @+60 19-821 8251 . Confirm me. Kamu tunggu tutup lubang wall, slab screeding dan itu wall plastering.

[27/7/2024 11:27 AM] Azman HKL: TQ. Lepas ni, lepas buka terus tutup ya. Jangan biar lama2.. kualiti maw jaga nuga. Jangan cincai tutup. Kita buat cantik2 sampai puas hati semua..

[27/7/2024 11:44 AM] EG Mall Shafee: Ok…

                                                     


[27/7/2024 11:52 AM] Azman HKL: 9th floor. Please make it good. Wall surface not even. Konsultan also cant accept. @+60 12-843 3877 🙏

[27/7/2024 11:54 AM] +60 19-821 8251: Seal opening untuk machine beam, screeding and motor room door


[27/7/2024 11:55 AM] Azman HKL: Wall opening patching in progress. 💪💪👌

[27/7/2024 11:56 AM] Azman HKL: ELV conduit

[27/7/2024 12:06 PM] +60 12-843 3877: 👌

[27/7/2024 12:25 PM] Azman HKL: @+60 12-843 3877 @+60 11-6219 0511 @+60 14-379 2990 ini ulang kali kita reminder. Tolong ya ya housekeeping. LSK saya tahu hari2 dia ada gambar kerja housekeeping dia. Yang lain2 tolong. Semua M&E kena bising.

[27/7/2024 12:26 PM] Azman HKL: Ini atur dia sana hotel.

[27/7/2024 12:26 PM] Azman HKL: 🙏🙏

[27/7/2024 12:27 PM] +60 12-559 6863: Azman, tidak perlu inform lagi, hantar orang kita kasi buat dan back charge saje

[27/7/2024 12:37 PM] +60 16-837 8881: Ya Azman , tapi confirm gambar masa lepas kerja , ini masa sedang kerja sampah saya mesti ada , tapi setiap hari jam 4 lebih saya akan kumpur semua sampah dan buang kalau boleh

[27/7/2024 12:46 PM] +60 16-837 8881: Org saya memang sedang buat tadi kan ?

[27/7/2024 1:04 PM] +60 16-837 8881: Saya urus terus kereta surung dan buang , kalau karung karung banyak cerita

[

[27/7/2024 1:06 PM] HIDAYA KH office Num: NSC- KH- Daily Manpower



 [27/7/2024 1:58 PM] +60 12-843 3877: Rectifycatioin _done

[27/7/2024 1:58 PM] +60 12-843 3877:Level 9 hotel unit Rectifycatioin _done @Azman HKL


[27/7/2024 2:00 PM] EG Mall Shafee: Turun pegi level 8

[27/7/2024 2:01 PM] EG Mall Shafee: Mock up room…

[27/7/2024 2:02 PM] Azman HKL: Terima kasih Raman. Pastikan semua ya kasi rata dia sebelum wall skim.🙏

[27/7/2024 2:07 PM] Azman HKL: @+60 12-843 3877 @+60 17-866 0355 tolong dulu minta orang kamu yang di 8th floor pg tgk dari mana itu air? 🙏

[27/7/2024 2:14 PM] HIDAYA KH office Num: king hong corring di level 9. pastu kena conduit dalam slab. pastu air tu keluar ikut junction box

[27/7/2024 2:15 PM] Azman HKL: Owh ok. @+60 17-866 0355 @+60 12-843 3877 tgk kalau masih pakai. Kalau tdk, kasi tutup saja. Runding sama @HIDAYA KH office Num . Settle dia di site saja.🙏

[27/7/2024 2:17 PM] +60 17-866 0355: @ok nanti sa cek@@Azman HKL

[27/7/2024 3:29 PM] +60 12-843 3877: Dcc Daily Report _work Progress


 Installation PVC conduit

@8 th floor _hotel unit

 

 

Inspection forwall

@hotel 9 th floor by  dcc

 

Hacking works @10 &15 floor

 

Running trunking

@hotel unit_level 8&9

 

Hacking & rectifycatioin works

@8&9th floor

[27/7/2024 4:10 PM] Azman HKL: Sample unit. Waterproofing will start on tuesday. Please get  all the work done. After waterproofing no more coring and hacking. 🙏

 




 




















EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...