EG Mall site daily(30/7/2024)
Date: 30 July 2024 (2.10pm)
Site Coordination Meeting No.7
- Hidayah
1. Site walk with EG bosses and consultant - tomorrow at 3pm
2. Plastering works - use chicken wire mesh (by HKL) for plastering works to prevent cracking.
3. RWDP & scupper drain GF to 7th floor - install temporary piping to drain stagnant water.
4. Pressure test - submit pressure gauge certificate before the test.
No comments:
Post a Comment