Thursday, June 6, 2024

06 JUN 2024 HKL


SITE EG MALL




[14:22, 06/06/2024] Kadapi J. PROMES: Level 7 toilet, the pipe's is too big for single layer bricks. KH, please propose smaller pipe for this section so that our pipe can be fit in into single layer bricks without damaging it. Tq




 NSC GROUP 

[08:07, 06/06/2024] Azman HKL: @EG Mall Shafee bro.. bilah mau ksi lari ini ducting aircon...
[08:08, 06/06/2024] Azman HKL: Morning. @~Rimon Joseph macam kita discuss semalam. Tolong atur ini sama kamu punya subcon ASAP.

[10:12, 06/06/2024] Azman HKL: 13th floor. @HIDAYA KH office Num  ok please check and study. Brickwall below floor trap dropper. Maybe we need to install the pipe first.πŸ™
[10:23, 06/06/2024] HIDAYA KH office Num: okay2. I'll check first

[13:09, 06/06/2024] Azman HKL: Site progress photo.
6/6/24.
21st floor. Plinth cast.

[13:09, 06/06/2024] Azman HKL: 7th floor. TB6. Slab formwork, rebar and M&E conduit in progress.

[13:09, 06/06/2024] Azman HKL: 3rd floor. Z8. Slab formwork in progress.

[13:12, 06/06/2024] Azman HKL: 8th floor. Corridor plastering. @~WY tolong ini ya. πŸ™. Alih dia supaya wall plastering boleh jalan. Nanti tolong saya bagi gambar bila sudah alih ya. Saya maw kasi inform lagi subcon supervisor. Dia boleh masuk plaster atau tidak. πŸ™

[13:24, 06/06/2024] Azman HKL: ST6. SPD riser. Semua riser @~WY @~Rimon Joseph   ini brickwall kamu minta buka kan? Ada marking biru. Kasi inform sini group macam biasa. Nanti saya lupa tidak dapat follow up. πŸ™
[13:25, 06/06/2024] +60 14-379 2990: Ya man, perlu buka ini..
[13:33, 06/06/2024] Azman HKL: @~Roxas Ng (Kai) @~nas4rie tolong ya. πŸ™econmech ada marking sana berapa besar mereka perlu untuk masuk ducting. SPD riser. ST6.
[13:53, 06/06/2024] Azman HKL: Ini boleh kita simpan target ka bila boleh start sample di riser room? @HIDAYA KH office Num @~WY . Kalau dapat ini minggu maw start.πŸ™
[13:56, 06/06/2024] Azman HKL: 2nos untuk sample saja.
[14:21, 06/06/2024] Azman HKL: Info dulu itu rubbish chute ada kita buat maintenance kejap, BOBCAT ada surung itu sampah jadi kami minta kerjasama stop dulu pembuangan sampah...@+60 17-238 9414 @+60 19-530 2811
[15:36, 06/06/2024] Azman HKL: Site meeting.
[16:56, 06/06/2024] +60 10-941 8970: @Azman HKL @~WY all done remove C channel support besok boleh start pasang ducting ☺️πŸ‘πŸ»
[16:57, 06/06/2024] +60 10-941 8970: Remaining concrete need to hack at GF