Saturday, April 20, 2024

20 APRIL 2024 HKL

 NSC GROUP 

[08:32, 20/04/2024] Azman HKL: Site photo progress.
20/4/24.
20th floor. TA. Slab cast. Lift wall formwork in progress.

[08:32, 20/04/2024] Azman HKL: 5th floor. TB6. Column rebar in progress.

[08:32, 20/04/2024] Azman HKL: 5th floor. TB4. Slab formwork in progress.

[16:05, 20/04/2024] Azman HKL: MH17-MH20pipe casting in progress.