[9:44 am, 31/03/2024] Azman HKL: Site progress photo.
31/3/24
19th floor. TA1. Slab formwork and rebar in progress. 18th floor. TA2. Slab support in progress.
[9:44 am, 31/03/2024] Azman HKL: 7th floor. TB3. Slab formwork in progress.
EGMALL COORDINATION (6 18th floor. Tower B. Installation. ELV, Electrical, ACMV, FF drain pipe services done installation. 18th floor. Tow...