Sunday, March 31, 2024

01 APRIL 2024 HKL

SITE EG MALL

[07:51, 01/04/2024] +60 12-559 6863: Good morning admin, please add our new archi sipervisor to the group, thanks
[08:38, 01/04/2024] Kadapi J. PROMES: Tak bileh add. Dia kasih privated dia punya whatsapp๐Ÿ˜…. Ask him to make it public.
[08:46, 01/04/2024] +60 12-559 6863: Kadafi, try again to add him ya๐Ÿ™
[08:46, 01/04/2024] Azman HKL: Nanti saya inform dia. Sudah invite.
[08:50, 01/04/2024] Kadapi J. PROMES: https://www.facebook.com/share/r/J5YJ3jJ9tHskdh5x/?mibextid=D5vuiz






[10:46, 01/04/2024] +60 16-880 4632: @HIDAYA KH office Num @Azman HKL @~Roxas Ng (Kai)  since you already started fabrication the water tank.who don't you final the rest of work.
1.Plinth levelling..2.soffit slab touch up.3.painting work .4.debris.hacking cement waste to clear ...please do it right.
[10:47, 01/04/2024] +60 16-880 4632: L3 Water tank room.





[10:50, 01/04/2024] Kadapi J. PROMES: Agreed
[10:51, 01/04/2024] +60 16-880 4632: L5 @ST05 Lift Lobby Plastering..
[11:50, 01/04/2024] Azman HKL: 19th floor. TA1. Request for M&E inspection at 3pm. @Kadapi J. PROMES . NSC PIC please stand by the site during inspection. @~WY @~s4yamahuk4ya88.gmail.com @HIDAYA KH office Num @~zee 

[15:26, 01/04/2024] Azman HKL: 19th floor. M&E Inspection in progress.

 NSC GROUP 

[8:30 am, 01/04/2024] Azman HKL: Monday Site safety toolbox.

[8:31 am, 01/04/2024] +60 12-559 6863: @EG MALL Mr Lo sini ada 2 paip dri building masuk MH.....itu king Hong bila mau bikin
[8:31 am, 01/04/2024] +60 12-559 6863: King Hong, connect the pipes to MH, do it one short to avoid future excavation
[8:32 am, 01/04/2024] +60 12-559 6863: @Azman HKL @EG MALL Mr Lo take lead
[8:33 am, 01/04/2024] EG MALL Mr Lo: noted
[8:43 am, 01/04/2024] Azman HKL: @HIDAYA KH office Num tolong atur ya. Bincang sama subcon sewerage jalan sama2.

[0:26 pm, 01/04/2024] Azman HKL: @~zee nanti lepas buka kasi gambar ya. ๐Ÿ‘†
[0:30 pm, 01/04/2024] +60 18-960 2589: Ok,
[3:37 pm, 01/04/2024] Azman HKL: 19th floor. TA1. M&E inspection done. @~nas4rie @Mr. Voo please proceed.

[4:39 pm, 01/04/2024] Azman HKL: @~WY @EG MALL ECONMECH Dart bila maw start sini vent ducting di 8th floor unit sample? Bagi saya date.. Maw pasang frame sebelum bata  dan plaster di unit lain.
[4:39 pm, 01/04/2024] Azman HKL: Itu sprinkler macam atas ducting..
[4:57 pm, 01/04/2024] EG MALL ECONMECH Dart: Esok dscuss d coordination man ๐Ÿค๐Ÿซถ









01 APRIL 2024

 














Saturday, March 30, 2024

31 MAC 2024 HKL

 NSC GROUP 

[9:44 am, 31/03/2024] Azman HKL: Site progress photo.
31/3/24
19th floor. TA1. Slab formwork and rebar in progress. 18th floor. TA2. Slab support in progress.

[9:44 am, 31/03/2024] Azman HKL: 5th floor. Slab formwork in progress.

[9:44 am, 31/03/2024] Azman HKL: 7th floor. TB3. Slab formwork in progress.

[4:15 pm, 31/03/2024] Azman HKL: 19th floor..TA1. slab rebar and M&E in progress.




Friday, March 29, 2024

30 MAC 2024 HKL

SITE EG MALL

[14:28, 30/03/2024] Azman HKL: 2nd floor. Wiring inspection in progress.

[14:30, 30/03/2024] Azman HKL: 1st floor. Wiring inspection in progress.

[15:26, 30/03/2024] Azman HKL: Ducting fan store temporarily in the ground floor..


 NSC GROUP

[8:16 am, 30/03/2024] Azman HKL: Site progress photo. 
30/03/2024.
19th floor. TA1. Slab formwork and rebar. 18th TA2. Column rebar, lift wall works, slab scaffolding support.

[8:16 am, 30/03/2024] Azman HKL: 4th floor. TB6. Slab support, ST RC wall rebar, column rebar.

[8:16 am, 30/03/2024] Azman HKL: 7th floor. TB3. Slab formwork.

[8:26 am, 30/03/2024] Azman HKL: Basement. Fire water tank room.@~WY @EG MALL ECONMECH Dart ini duct maw frame? Tolong check MOS? Bata sedang jalan sini ya. Nanti susah kamu pasang.๐Ÿ‘†

[8:49 am, 30/03/2024] Azman HKL: 3rd floor. Water tank room. Water tank no.1 installation in progress. Estimate to complete on Thursday. @~Roxas Ng (Kai) tolong push Subcon kasi siap plinth. ๐Ÿ™

[3:17 pm, 30/03/2024] Azman HKL: 19th floor. TA1. Slab rebar works in progress..๐Ÿ‘†
[3:18 pm, 30/03/2024] Azman HKL: @~Leppong @~zee ๐Ÿ‘†take note yer. Atur dia. ๐Ÿซฐ.


EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...