[09:56, 27/12/2023] Azman HKL: Siye progress photo.
27/12/2023.
10th floor. TA1. Slab rebar & M&E in progress. 9th floor. TA2. Slab formwork and scaffolding in progress.
[09:56, 27/12/2023] Azman HKL: 4th floor. Z7. Slab rebar in progress. 6th floor. Z6. Slab formwork in progress
[09:56, 27/12/2023] Azman HKL: 6th floor. TB5. Slab formwork in progress.