Tuesday, October 31, 2023

01 NOV 23 HKL

SITE GROUP
EG MALL Azman: SPD fabrication and installation in progress at 1st floor. ST5, ST8.👆@Kadapi J. PROMES
EG MALL Azman: Mitsubishi on site to check the casted lift perimeter.

NSC GROUP
]EG MALL Azman: Site progress photo.
1/11/23.
1st floor. Slab beam rebar in progress.
EG MALL Azman: 1st floor, TB4. Column rebar in progress
 EG MALL Azman: 1st floor. Column rebar in progress
EG MALL Azman: 2nd floor. Column rebar in progress
EG MALL Azman: Basement. Z9. Earthwork and slab foundation in progress.
EG MALL Azman: 7th floor. Slab beam formwork in progress.
EG MALL Azman: @~Rimon Joseph ini semua ducting SPD kan. Itu ST9, ST7, ST5 tolong cek dia boleh pasang k. Bila start pasang panggil saya k. Kita bawa konsultan. Kalau ada masalah inform saya.🙏
EG MALL Azman: 1st floor. Z7. Column rebar in progress.
+60 19-809 6068: SPD fabrication and install in progress 1st floor..
+60 16-526 1788: 🤲🏾
EG MALL Azman: @~LO KEAM Any new update regarding this item?
Edwin Chen 013: @Lo. W. H (HKL-Site Engineer), any update on our submission for the scupper drain SD?
 Lo. W. H (HKL-Site Engineer): I yet received any
+60 19-895 9900: Apa item?
Lo. W. H (HKL-Site Engineer): item a and item b,c
EG MALL Azman: Weight of each equipment for slab design purposes.
 +60 19-895 9900: Bukan dah submit kah?
 +60 19-895 9900: Pls check email & ur counter
 +60 19-895 9900: Item b&c we awaiting latest elec construction dwgs only we can provide
 +60 19-895 9900: Hope its clarified tq
EG MALL Azman: TQ bro. 👌 tdk perasan bah. 👍🏻👍🏻
+60 19-895 9900: 😄👍🏻👍🏻👍🏻

 EG MALL Azman: 👍🏻
+60 14-379 2990: Staircase 5 Level 1
+60 14-379 2990: Staircase 5 Level 2
+60 14-379 2990: Staircase 5 Level 3
 +60 14-379 2990: Progress pressurisation duct @EG MALL Azman































 

31 OCT 23 HKL

SITE GROUP

+60 12-843 3877: Installatio pvc conduit @level 5

 +60 12-843 3877: Installation pvc conduit@level 5_slab was done
 EG MALL Azman: 5th floor. TA2. Request for inspection of M&E services. @Kadapi J. PROMES on 3pm. 🙏🙏
 EG MALL Azman: NSC please stanby and get ready with RFI form and drawing 3pm. TQ
 +60 12-843 3877: Installation pvc conduit for ELE/ELV points already inspection by M&E -COW


NSC GROUP


 EG MALL Azman: Kuat juga air masuk. @HIDAYA KH office Num boleh cari cara kasi stop itu air masuk dalam ka? Sini basement, zone TB4a.
 EG MALL Azman: Can use polyfoam temporary closed the opening?
EG MALL Azman: Ini boleh guna ka? Temporary.. tutup dari dalam..
EG MALL Azman: @Edwin Chen 013
 Edwin Chen 013: I reckon this doesn't work very well with water. We will address this problem with other method
EG MALL Azman: Very appreciate.. 🙏🙏 tq..

EG MALL Azman: Site photo progress.
31/10/2023.
5th floor. TA2. Slab rebar and M&E services in progress.
 EG MALL Azman: 5th floor. TA2. Slab rebar in progress
EG MALL Azman: 1st floor. TB4/a. Slab beam rebar in progress.
EG MALL Azman: 1st floor. Z7. Column rebar in progress.
 EG MALL Azman: 3rd floor. TB3. Slab formwork in progress.
EG MALL Azman: 1st floor. TB4. Column rebar in progress.
 EG MALL Azman: 2nd floor. TB5. Column in progress.
 EG MALL Azman: M&E coordination meeting. Today at 3.30pm after subcon weekly meeting at site meeting.
+60 12-843 3877: Installatio pvc conduit @level 5
 +60 12-843 3877: Installation pvc conduit@level 5_slab was done
 +60 14-379 2990: @EG MALL Azman our duct already on site..
+60 14-379 2990: Kami start Str 5 and str 8 dulu
+60 14-379 2990: Str 5
 Raymond Chong. Y. F (HKL P. Manager): jangan lupa lintol beam
EG MALL Azman: Noted.. 🫰
 +60 12-843 3877: Installation pvc conduit for ELE/ELV points already inspection by M&E -COW
EG MALL Azman: 👌
+60 12-843 3877: ☝️level_5


























































 

31 OCT 23








 

Sunday, October 29, 2023

30 OCT 23 HKL

SITE GROUP
EG MALL Azman: 1st floor. Z7. Request for inspection M&E.  4pm. @Kadapi J. PROMES


NSC GROUP

EG MALL Azman: Morning. Safety toolbox 9.00am. All NSC site workers please attend. TQ.
 HIDAYA KH office Num: okay
EG MALL Azman: Housing for water pump plinth at basement fire tank room
EG MALL Azman: @~Walker Yapi 👆
EG MALL Azman: Ground floor. NSC safety tool box. 9.00am.
 EG MALL Azman: Site progress photo. 
30/10/2023.
1st floor. Z7. Slab rebar and M&E services in progress.
EG MALL Azman: 1st floor. TB4a. Slab formwork in progress.
 EG MALL Azman: 2nd floor. TB5. Column rebar in progress
EG MALL Azman: 5th floor. TA2. Skab formwork and rebar in progress.
 EG MALL Azman: TA2. 5th floor. Slab formwork and rebar in progress
 EG MALL Azman: 7th floor. TA1. Slab beam formwork in progress.
EG MALL Azman: Basement. Z9. Earthwork in progress
 EG MALL Azman: Basement earthwork in progress
 EG MALL Azman: @~Walker Yapi morning. Kamu punya subcon ducting ada datang ini hari kan? Kasi report awal ya. Mana kamu start. Itu SPD riser.
[09:46, 30/10/2023] +60 14-379 2990: Okay man.
EG MALL Azman: Sedang kasi bersih. @~Walker Yapi nanti petang kita tgk. Pg marking dia.👆
+60 14-379 2990: Marking plinth fire pump siap sudah .. @~Nasri @EG MALL Azman
 EG MALL Azman: M&E services inspection in progress
EG MALL Azman: Done M&E inspection. @Mr. Voo @~Nasri please proceed.




























 

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...