SITE GROUP

 Kadapi J. PROMES: Tolong kasih rapat sikit tu box ke underneath
+60 17-866 0355: Ok bos
 
 Kadapi J. PROMES: NSC's, do we any solution for those out of wall conduits?
Azman HKL: Bossku. @Kadapi J. PROMES Request for M&E inspection. 2nd floor. Zone TB1. Slab. 3pm. @~. @~Walker Yapi @Leung KH🍀 please stanby at site 3pm. TQ.
Azman HKL: Get RFI and latest shopdrawing ready on site for inspection.
[17:59, 26/05/2023] Azman HKL: Strong Reminder
1. NSC site PIC must join during site inspection.
2. Pls submit RFI form with latest approved shop drawing. 
3. Workers should standby onsite/oncall during casting. 
4. Daily reports are submitted everyday during work hours. 

 Thank you for your cooperation.🙏


NSC GROUP
Azman HKL: Site progress picture.
25/05/2023.
2nd floor. Zone TB1. Slab rebar and M&E in progress.
Azman HKL: Ground floor. TB2. Slab formwork in progress.
 Azman HKL: Ground floor. TA1. Column in progress
Azman HKL: Ground floor. Zone  slab formwork & beam rebar in progress.
 Azman HKL: Basement, TB3. Column rebar in progress. Earthwork in progress.
Azman HKL: 3rd floor. Zone 5. Slab formwork in progress.
Azman HKL: 2nd floor. Zone 4. Column rebar in progress. 3rd floor slab formwork in progress.



Azman HKL: Basement..staircase 7..plastering
 Azman HKL: Ground floor. Zone 6. Bottom rebar in progress.
+60 17-866 0355: DCC inspection done
 +60 17-866 0355: M&E. inspection done
 Azman HKL: Done.👌