Azman HKL: Good morning.
Site picture progress. 8/5/2023 1st floor. Zone TA1. Bottom & top layer slab rebar in progress. M&E conduit in progress.
Azman HKL: Basement. Zone 7B cast. 7C lean con.
Azman HKL: Basement zone 5a. Retaining wall in progress.
Azman HKL: Ground floor slab &beam formwork in progress.
Azman HKL: Basement bomba lift wall in progress.
Azman HKL: 2nd floor, zone 5. Formwork slab in progress.
Azman HKL: 2nd floor. Zone 4. Slab formwork in progress.
+60 12-833 6147: Casting of the passenger lift slab at basement level in progress.
+60 12-843 3877: M&E Insfection
Kadapi J. PROMES: Roger, tolong share drawing tadi yg kita guna utk inspection tadi.
Kadapi J. PROMES: Share dlm ni group ya
Edwin Chen 013: @Leung KH🍀 , please handle
+60 12-843 3877: M&E ready for insfection