Friday, June 13, 2025

EGMALL COORDINATION (6/6/2025)

  EGMALL COORDINATION (6/6/2025)

18th floor. Tower B. Installation. ELV, Electrical, ACMV, FF drain pipe services done installation.

18th floor. Tower B


18th floor. AC drain pipe