EG MALL NSC ( 26 APRIL 2025)
Site progress photo.
26/4/2025
7th floor, Mezanine
Tower A. 21st floor. Slab waterproof and screeding.
Tower B.
16th floor. Wall rebar
16th floor. Slab panel
Tower B. 16th floor.
Tower B. 16th floor.
7th floor. ST4. Staircase roofing.
Incoming SESB. PN10 pipe repair.
[26/4/2025 11:38 AM] +60 12-559 6863: Hidayah, kami tengah buat waterproofing kat water tank sana, ini akan rosak membrane
[26/4/2025 11:41 AM] HIDAYA KH office Num: okay boss. saya pegi check sana