RAY CHONG: Dear all, see u all at L21 9am
@Yoon, please check this escalator opening and beam position

[23/5/2025 8:50 AM] EG MALL Mr Lo: please advise the recess of the beam where the support of escalator
[23/5/2025 8:50 AM] EG MALL Mr Lo: @~YoonYK
[23/5/2025 8:55 AM] +60 19-821 8251: Morning @~π‘…π’Άπ“Ž π’žπ’½π‘œπ“ƒπ‘” will check back on site to inspect the opening but not the length of the opening as the scaffolding need to be removed then i can plum line. Will get back to you.
[23/5/2025 8:57 AM] +60 19-821 8251: Here is recess drawing, drawing upload here for your reference. Hard copy had been send to your office also. Thanks

Tower A. L21. Joint inspection with client and consultant.

16th floor. Tower A
[23/5/2025 1:29 PM] +60 12-559 6863: Dear all, Tower B L17 target casting tomorrow ya
[23/5/2025 1:29 PM] +60 12-559 6863: please complete your works before 10am tomorrow

HIDAYAH: we'll try our best. but, complete the bottom bar first boss. then we (m&e) can proceed with the installation.


@~LO KEAM @EG MALL Nasri please push this area critical slab rebar. M&E need min a half day to install services at this area. They are waiting since yesterday. πŸ‘
@~Leppong @~zee @~WY🫨 kamu punya sudah boleh pasang itu tempat ka? Kalau ada masalah terus kasi tau. Jangan diam saja. Sama2 kerjasama.πŸ‘
Tower B. 17th floor. @EG MALL Nasri @EG MALL Mr Lo itu wall inspection dulu baru tutup kan. C&S dan M&E inspection. C&S bila inspection? Maw sekali cek dengan M&E naik.