[28/3/2025 9.36 AM] Azman HKL: Site progress photo
28/3/2025
Tower A.
[28/3/2025 9.38 AM] Azman HKL: 21st floor. Floor water ponding and wall plastering.
[28/3/2025 9.42 AM] Azman HKL: 7M. Plinth rebar and formwork . Slab rebar and M&E.
[28/3/2025 9.46 AM] Azman HKL: Tower B.
15th floor slab rebar and M&E
15th floor slab panel
14th floor. Wall rebar
[28/3/2025 2:06 PM] +60 14-692 9831: @Azman HKL case yg sama cam d timgkat 9
[28/3/2025 2:07 PM] +60 14-692 9831: ni Level 11
[28/3/2025 2:10 PM] Azman HKL: @~WY nanti tolong tak kalau dapat ejas dia. 👏