EG MALL NSC ( 14 APRIL 2025)
Site progress photo
14/4/2025
Tower A.
Tower A. 21st floor. Slab screeding works
7M. Water tank plinth formwork.
Tower B.
16th floor. Slab panel.
15th floor. Wall rebar.
15th floor. Slab rebar and M&E
Tower B. 16th - 15th floor.
Tower B. 15th floor.
Tower B. 15th floor.
Kami siap sudah loading hot water tank. @Azman HKL
AZMAN: Kejap. Aku di 20 saja.