Sunday, April 20, 2025

EGMALL COORDINATION (19/4/2025)

  EGMALL COORDINATION (19/4/2025)

@Azman HKL morning, as per our previous site meeting, kindly request a temporary door for lift motor room. Thanks.
Ok noted. Tonight my man will build the door. πŸ‘

[19/4/2025 9:37 AM] Kadapi J. PROMES: @Azman HKL @HIDAYA KH office Num, please don't use glue for temporary joint to avoid burning unplug joint like this. Tq
[19/4/2025 9:38 AM] Azman HKL: Noted. Will inform Subcon and workers. πŸ‘
[19/4/2025 9:40 AM] HIDAYA KH office Num: noted boss

Resistant test. TOWER A, level 12 Hotel


EGMALL COORDINATION (17/4/2025)

 EGMALL COORDINATION (17/4/2025)


Tower B. 15th floor. Request for inspection at 9am. @Kadapi J. PROMES @~sam . All NSC , please standby at site during inspection.πŸ‘


Tower B. 15th floor. M&E inspection on Slab.


Done inspection. @EG MALL Nasri please proceed..


EGMALL COORDINATION (8/4/2025)

EGMALL COORDINATION (8/4/2025)

7M. Cooling tower, water tank. Plinth inspection.

7M. Done M&E inspection. Please proceed. @EG MALL Nasri


EGMALL COORDINATION (7/4/2025)

   EGMALL COORDINATION (7/4/2025)





EGMALL COORDINATION(28/3/2025)

  EGMALL COORDINATION(28/3/2025)

28/07/2025
7M. Request for inspection at 2.30pm. @~sam . Site NSC PIC, please standby on site during inspection .



[28/3/2025 3:01 PM] Azman HKL: Done inspection. @EG MALL Nasri please proceed..
[28/3/2025 3:42 PM] EG MALL Nasri: Ok man thank you 🫑


EGMALL COORDINATION(27/3/2025)

 EGMALL COORDINATION(27/3/2025)






[27/3/2025 9:43 AM] HIDAYA KH office Num: morning. Our pipes sustained damage during the hacking process, as shown in the attached image. Please be advised that these pipes have already undergone our standard pressure testing to ensure their integrity. However, we are currently unsure if other rooms may be experiencing the same issue. Further assessment may be required.
[27/3/2025 9:47 AM] Kadapi J. PROMES: Please rectify and re-call for official pressure test. Please list down how many room diffected. Tq
[27/3/2025 9:58 AM] HIDAYA KH office Num: @Azman HKL
[27/3/2025 9:59 AM] +60 12-559 6863: Hidayah, location?
[27/3/2025 10:03 AM] Azman HKL: Thanks for inform. I will check with Debra or Michael the defect work. πŸ‘
[27/3/2025 10:05 AM] Azman HKL: Hotel, what level and the current room.
[27/3/2025 10:19 AM] HIDAYA KH office Num: hotel 13th floor . room 18&20
[27/3/2025 10:24 AM] Azman HKL: Okay thanks. Itu tempat paip saya minta mereka jangan tutup dulu. Tolong rekod saja. Repair dan retest dulu.


EG MALL NSC ( 19 APRIL 2025)

   EG MALL NSC ( 19 APRIL 2025)


Joint inspection with consultant. Tower A. 21st floor.

EG MALL NSC ( 17 APRIL 2025)

  EG MALL NSC ( 17 APRIL 2025)


[17/4/2025 8:12 AM] +60 12-559 6863: M&E site walk at 9am

[17/4/2025 8:21 AM] +60 12-559 6863: Meet at L21

[17/4/2025 8:24 AM] Azman HKL: Can postponed bos? Tower B. 15th floor. 9am, slab inspection M&E with consultant and NSC. C&S inspection also at 9am.

[17/4/2025 8:37 AM] +60 12-559 6863: Ok, 2pm

Tower B. 15th floor. M&E inspection on Slab.

[17/4/2025 11:59 AM] Azman HKL: NSC, please be inform. Site walk postponed to Saturday, 9am morning.

[17/4/2025 1:30 PM] +60 12-559 6863: I want all to attend, no last minute inform cannot join, including Mitsubishi

[17/4/2025 2:53 PM] +60 12-559 6863: @EG MALL ECONMECH Dart Service Apartment sprinkler pipe jalan atas siling atau wall?

[17/4/2025 2:54 PM] +60 12-559 6863: kalao atas siling kasi jalan cepat L8 and L9

[17/4/2025 2:58 PM] EG MALL ECONMECH Dart: Ok bos

[17/4/2025 2:58 PM] EG MALL ECONMECH Dart: Atas ceiling

[17/4/2025 3:00 PM] +60 12-559 6863: bolih atur orang jalan L9 Tower B segera? kami mau jalan frame ceiling

[17/4/2025 3:01 PM] EG MALL ECONMECH Dart: Sy atur dlu bos πŸ™πŸΌ



EG MALL NSC ( 16 APRIL 2025)

    EG MALL NSC ( 16 APRIL 2025)

7th floor. ST7 top roof. Please double check services. @~WY🫨 @~zee @~Leppong 



7th floor. Joint inspection.


Lv8 - office unit 2
[16/4/2025 1:33 PM] Debra S. HKL: @Azman HKL temporary ka ni? Mau install ceiling frame sini
[16/4/2025 3:38 PM] Azman HKL: Itu temporary. Kita yang pasang. Sudah buka untuk jalan siling.


EG MALL NSC ( 15 APRIL 2025)

    EG MALL NSC ( 15 APRIL 2025)

Tower B. 15th floor

Tower B. 15th floor. Slab panel and M&E in progress.



[15/4/2025 10:40 AM] Azman HKL: @Azman HKL atur Mitsubishi kasi alih ini semua
[15/4/2025 10:41 AM] Azman HKL: @~YoonYK tolong dulu. Skrg maw jalan bata sudah. πŸ‘πŸ‘
[15/4/2025 10:44 AM] +60 19-821 8251: Morning, petang sikit orang saya datang alih ini.
[15/4/2025 10:46 AM] Azman HKL: Ok. Thanks you. πŸ‘πŸ‘

 @~YoonYK: Ok siap alih πŸ‘Œ



EG MALL NSC ( 14 APRIL 2025)

   EG MALL NSC ( 14 APRIL 2025)

Site progress photo
14/4/2025
Tower A.

Tower A. 21st floor. Slab screeding works

7M. Water tank plinth formwork.

Tower B. 
16th floor. Slab panel.
15th floor. Wall rebar.
15th floor. Slab rebar and M&E

Tower B. 16th - 15th floor.

Tower B. 15th floor.

Tower B. 15th floor.

Kami siap  sudah loading hot water tank.  @Azman HKL
AZMAN: Kejap. Aku di 20 saja. 



EG MALL NSC ( 12 APRIL 2025)

  EG MALL NSC ( 12 APRIL 2025)

@Azman HKL tu barang tiada lagi orang kc pindah ka Mitsubishi?
[12/4/2025 8:40 AM] Azman HKL: Morning. @~YoonYK slab hacking work in progress. Tolong itu yang satu kasi pindah. Takut terkena lantai jatuh..
[12/4/2025 8:42 AM] +60 19-821 8251: Noted akan arrange orang kasih pindah, atau fork lift boleh kasih adjust sikit pun ok. πŸ‘Œ
[12/4/2025 8:44 AM] Azman HKL: Kalau boleh ada satu orang untuk kasi pantau dia. πŸ‘



@EG MALL Nasri minta tolong orang buat kerja abortive work kasi clear ini. Dia blocking itu hot water tank keluar
[12/4/2025 8:48 AM] Azman HKL: Ini maw angkat ke atas ini hari. Kalau dapat minta kasi clear pagi ini. πŸ‘πŸ‘πŸ‘
[12/4/2025 8:59 AM] EG MALL Nasri: Jap aku turun dan atur

Thanks @EG MALL Nasri


20th floor.. siap sudah yaa @Azman HKL @Debra S. HKL 

Ground floor. Escalator relocation..

The hot water tank was delivered  to 21st floor. @Azman HKL @~π‘…π’Άπ“Ž π’žπ’½π‘œπ“ƒπ‘” 


[12/4/2025 1:32 PM] +60 12-559 6863: sudah masuk kah//?
[12/4/2025 1:45 PM] Azman HKL: Sedang atur ni bos.



Kacau cement untuk screeding fan room


EGMALL COORDINATION (26/6/2025)

   EGMALL COORDINATION (26/6/2025) [26/6/2025 4:41 PM] Azman HKL: Consultant commented. DCC ada orang maw rectify ini ASAP. πŸ‘ [26/6/2025 4:...