EGMALL COORDINATION(4/3/2025)

  EGMALL COORDINATION(4/3/2025)

AZMAN: 7th floor. Zone P7. Request for pre-inspection. 11.00am. @Kadapi J. PROMES . Site PIC please standby on site during inspection. 

AZMAN: 7th floor. Zone P7. Inspection in progress.

KADAPI: No 1 can guarantee the gradient of this SANITARY r.c. beam opening. I can not accept it. Tq

[4/3/2025 11:00 AM] HIDAYA KH office Num: im on my way to the inspection

[4/3/2025 11:00 AM] Kadapi J. PROMES: KH please ensure the gradient only I can accept it. Tq

[4/3/2025 11:30 AM] Azman HKL: 7th floor. Zone P7. Done inspection. @EG MALL Nasri please proceed.👏