EGMALL COORDINATION(3/2/2025)
AZAMAN: 11th floor. Slab. M&E inspection in progress.
AZMAN: 12th floor. Wall inspection
[3/2/2025 1:52 PM] Azman HKL: Tower B. 11th floor slab and wall. M&E inspection done. @EG MALL Nasri @EG MALL Mr Lo please proceed..
[3/2/2025 1:53 PM] EG MALL Mr Lo: Ok



No comments:
Post a Comment