EGMALL COORDINATION(19/3/2025)
AZMAN: 7M. Consultant and installer joint discussion on site
AZMAN: As Site per-discussion, proposed plinth adding 400mm height for cooling tower condenser pipe Installations and services due to structure design changes.





No comments:
Post a Comment