EG MALL NSC ( 3 MARCH 2025)
EG MALL NSC ( 3 MARCH 2025)
7th floor. Staging for mezzanine. Slab formwork and rebar.
Tower B.
14th floor. Slab panel
13th floor. Wall rebar
13th floor. Slab panel
Tower B. 14th floor
Tower B. 13th floor.
Tower B. 13th floor.