EG MALL NSC ( 3 MARCH 2025)
7th floor. Staging for mezzanine. Slab formwork and rebar.
Tower B.
14th floor. Slab panel
13th floor. Wall rebar
13th floor. Slab panel
Tower B. 14th floor
Tower B. 13th floor.
Tower B. 13th floor.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
EG MALL SITE DAILY ( 31 JULY 2025)
EG MALL NSC ( 11 MARCH 2025)
EG MALL NSC ( 11 MARCH 2025) [11/3/2025 10:26 AM] +60 16-837 8881: Belum habis naik bata tapi mahu paitong sudah ? 6th floor. Genset roo...
EGMALL COORDINATION (8/4/2025)
EGMALL COORDINATION (8/4/2025) 7M. Cooling tower, water tank. Plinth inspection. 7M. Done M&E inspection. Please proceed. @EG MALL Nasri
EG MALL NSC ( 21 MAY 2025)
EG MALL NSC ( 21 MAY 2025) Ok. Noted. Will liase with @EG MALL Mr Lo @EG MALL Nasri . Please prepare the report and submit to us. Thanks. ...