Site progress photo.
15/03/2025
Tower A.
Tower A. 
21st floor. Brick work and slab waterproofing.
Tower A. 21st floor.
Tower A. 21st floor.
7th floor and Mezzanine.
Slab formwork and rebar.
Tower B.
14th floor cast.
14th floor. Wall and slab panel. Slab rebar 
13th floor. Wall rebar and panel
Tower B. 14th floor.
Tower B. 14th floor.
Tower B. 13th floor.