Tuesday, February 4, 2025

EGMALL NSC ( 3 FEB 2025)

   EGMALL NSC ( 3 FEB 2025)

[3/2/2025 8:23 AM] +60 12-559 6863: Azman/Lo, please arrange ASAP

Azman HKL: Basement. Fire water tank. Pump out water from the room still continues. @EG MALL ECONMECH Dart @~WY later check the condition. πŸ™


Azman HKL: 6th floor. Genset room. As per site discussion. @~s4yamahuk4ya88.gmail.com , Kahar, @EG MALL Nasri on Saturday. New plinth extension will be cast the same day with tower B, 11th floor or 7th floor slab. Cast plan by today.

[3/2/2025 8:48 AM] Azman HKL: Morning @~LO KEAM . Please share an update from your supplier regarding this plinth. New plinth cast plan by today. Hope you can plan with your supplier regarding this matter. Cc @EG MALL Mr Lo

[3/2/2025 8:54 AM] +60 19-895 9900: Mrng bossku, we always standby once the room is ready for us, the equipments has to be mobilized fully by the supplier to avoid warranty void, should there is any damage caused due to unauthorized person the supplier would not comply the warranty and should bear by the person who caused due

[3/2/2025 8:56 AM] +60 19-895 9900: New info frm suppler the plinth should follow the layout approved by consultant & Ecos to avoid any unwanted incident happen during the authorities inspection tq

[3/2/2025 8:59 AM] +60 19-895 9900: The transformer & switchgear room need to be flat & smooth before the equipments can move in and anchored, at the moment the room is being casted with previous genset plinth which obstructed the equipment to be seated in level

[3/2/2025 8:59 AM] +60 19-895 9900: Hope the above clarified tq

[3/2/2025 9:03 AM] Azman HKL: Thanks. Very appreciated.


Azman HKL: This 2. Confirm not needed and must be flat.. @EG MALL Mr Lo @EG MALL Nasri nanti kita pg check sama DCC di site. Kita rekod sebelum hack.


[3/2/2025 9:04 AM] EG MALL Mr Lo: Noted

[3/2/2025 9:05 AM] +60 19-895 9900: Wc bossku, we always ready to coordinate & standby to help in any situation that inside our controlπŸ™πŸ»πŸ™πŸ»πŸ™πŸ»

[3/2/2025 9:07 AM] +60 12-559 6863: Azman, if plinths not required then do we need to screed the floor before move in genset?

[3/2/2025 9:09 AM] Azman HKL: Yes.

[3/2/2025 9:10 AM] +60 12-559 6863: If so we need to erect brick wall with plastering before screeding, please coordinate with Debra

[3/2/2025 9:15 AM] Azman HKL: Noted. Will check with @~Debra S.

[3/2/2025 9:24 AM] +60 12-559 6863: Debra, discuss with QS for the brick/plastering works for these M&E rooms, who shall be doing

[3/2/2025 11:22 AM] +60 17-262 2803: Noted

[3/2/2025 9:28 AM] +60 12-559 6863: We need to start immediately











No comments:

Post a Comment

EG MALL SITE DAILY ( 31 JULY 2025)