[27/11/2024 9:43 AM] Azman HKL: Can I get a report, so I can forward to management. TQ. 🙏

[27/11/2024 9:49 AM] +60 19-821 8251: Sure will submit a report

[27/11/2024 9:50 AM] Azman HKL: Tq. 🙏

[27/11/2024 10:07 AM] +60 19-821 8251: @Azman HKL as per our tele conversation just now. We have no issue on this which is on ground and first floor landing door. It depends on your design on how you want to grout your lift lobby landing door. Thanks.

[27/11/2024 10:09 AM] Azman HKL: Ok thanks. Will check with my team. TQ. 👍🏻👌

[27/11/2024 10:12 AM] +60 10-219 8082: Basically from the picture, the entrance door not necessarily required to hack, but depends on the design of the entrance…straight or with inclination and etc..

[27/11/2024 10:13 AM] +60 10-219 8082: Or in short is how the grouting need to be done..then can decide if required to hack or not

[27/11/2024 10:18 AM] Azman HKL: Ok noted. I got information from your site subcontractor so we just seek confirmation. TQ. 👌

[27/11/2024 2:24 PM] +60 12-843 3877: Kalau tutup permanent

Lain kali macam mana mau masuk service 🥺

[27/11/2024 2:27 PM] +60 12-843 3877: Nanti dari mana orang mau masuk Tarek itu incoming Ssb cable?

[27/11/2024 2:31 PM] +60 12-559 6863: @~s4yamahuk4ya88.gmail.com pi tanya sama Promes




EGMALL NSC (26 NOV 2024)

     EGMALL NSC (26 NOV 2024)










[26/11/2024 10:57 AM] +60 12-559 6863: Dear all, 8F mock up rooms ceiling frames already completed, please move in and complete all services above ceiling by this week

[26/11/2024 10:57 AM] +60 12-559 6863: Azman, please coordinate

[26/11/2024 11:24 AM] Azman HKL: Tower A. Hotel. 8th floor. Mockup room. @~LO KEAM itu construction drawing baru ikut ID sudah ada kan. Asa masalah tolong inform. @~s4yamahuk4ya88.gmail.com tolong cek on site. Atur wiring dan testing untuk mockup room. 8th floor.🙏🙏

[26/11/2024 11:27 AM] Azman HKL: @~WY atur itu AC grill untuk mockup. Testing kasi proceed. Apa outstanding inform saya. 🙏

[26/11/2024 11:27 AM] +60 12-843 3877: Noted

[26/11/2024 11:28 AM] Azman HKL: @~zee kamu juga ya.

[26/11/2024 11:29 AM] +60 14-379 2990: Okay man.

[26/11/2024 11:30 AM] Azman HKL: @HIDAYA KH office Num piping juga ya. Terutama itu mockup room. Semua lobang kalau masih ada minta tutup dulu. 🙏

[26/11/2024 11:30 AM] HIDAYA KH office Num: okay azman

[26/11/2024 11:31 AM] +60 12-559 6863: kita buat 3 bilik, room 20, 21 & 22

[26/11/2024 11:32 AM] +60 12-559 6863: semua kerja above ceiling kena plaster balik, sudah dapat warning daripada DS

[26/11/2024 11:55 AM] Azman HKL: Please be informed that today Coordination meeting postponed. 🙏