Thursday, October 3, 2024

EGMALL NSC (30 SEPT 2024)

  EGMALL NSC (30 SEPT 2024)




[30/9/2024 8:29 AM] EG MALL Mr Lo: I believe pipe encasement as well on your piping

[30/9/2024 8:29 AM] EG MALL Mr Lo: Please 🙏, our perimeter drain need to progress

[30/9/2024 9:08 AM] Azman HKL: @+60 19-895 9900 @+60 16-837 8881 @+60 12-843 3877 please inform your waterproofing specialist.

[30/9/2024 9:43 AM] +60 12-843 3877: Esok pagi dia orang datang🙏

[30/9/2024 10:15 AM] Azman HKL: Inform besok bila sampai. Saya arranges C&S dan Consultant untuk joint inspection sekali. Kita atur ikut MOS. 🙏







[30/9/2024 11:10 AM] +60 16-837 8881: Hotel electrical riser

[30/9/2024 11:10 AM] +60 16-837 8881: 3 mingguh sudah

[30/9/2024 11:13 AM] +60 12-559 6863: floor?

[30/9/2024 11:13 AM] +60 16-837 8881: 15



[30/9/2024 3:03 PM] Azman HKL: Double check. 8th floor. Tower B. Corridor cloud area.

[30/9/2024 3:03 PM] EG MALL ECONMECH Dart: ok man tq

[30/9/2024 3:03 PM] EG MALL ECONMECH Dart: will study



No comments:

Post a Comment

EG MALL SITE DAILY (8 NOV 2024)

  EG MALL SITE DAILY (8 NOV 2024)