Site progress photo.12/8/24.8th floor. Tower B. Slab cast.
8th floor. Tower B. TP9. Slab formwork, rebar, tendons in progress.
7th floor. Zone P/7. Slab formwork and rebar.
21st floor. Tower A. Top plinth leveling in progress.
@HIDAYA KH office Num nie bila kamu mau tutup?
Tagging for sample Material submission. To all NSC, please use this sample tag to all sample submissions at the site especially at the site meeting room. TQ. 🙏 @EG MALL ECONMECH Dart @~LO KEAM @HIDAYA KH office Num @~sklaw3 @~YoonYK
[12/8/2024 9:26 AM] Azman HKL: Tolong atur hari ni @HIDAYA
KH office Num . Kita maw control itu banjir di basement. 🙏🙏🙏
[12/8/2024 9:28 AM] EG MALL ECONMECH Dart: installation pn
ble pkai or sample material seja?
[12/8/2024 9:28 AM] Azman HKL: Sample saja. Maw itu sign
consultant. Yang lama tiada sign consultant.
8th floor. Screeding floor by this week. Make sure all material and opening on the floor are taken out and done. Semua sampah, material di lantai kasi clear. Minta Site supervisor round lagi itu 8th floor. Nanti subcon screeding backcharge kalau mereka tolong kasi clear. 🙏🙏🙏
19th floor. Ducting fabricating in progress.
19th to 15th floor. @EG MALL ECONMECH Dart @~WY please check confirm. Maw pindah atau tidak. Maw consultant verification submit RFI awal. Sy sda inform sama consultant.
[12/8/2024 11:19 AM]
Azman HKL: Subcon bata maw jalan. Kalau ini sprinkler kena, kita maw pindah
cepat.
[12/8/2024 11:24 AM] EG MALL ECONMECH Dart: kmi inspection
dlu man
[12/8/2024 11:24 AM] EG MALL ECONMECH Dart: dlm bbrapa hri
[12/8/2024 11:24 AM] EG MALL ECONMECH Dart: sy mau claim ni
ubah kn
[12/8/2024 11:30 AM] Azman HKL: Kasi cepat ya. Subcon bata
tiada claim sekarang..🙏
16th floor. Tolong housekeeping selepas kerja. Jangan ampai2 barang. Wayar kasi gantung baik2 di atas. Supervisor pantau pekerja. Housekeeping jaga setiap hari.. 🙏
Cable pulling from 6th floor to ground floor switchgear.