[08:29, 13/06/2024] Azman HKL: Morning. Request for inspection. External HDPE PN10 at 9.00am. @Kadapi J. PROMES @~sam . DCC site PIC please stanby during inspection. @~Leppong 🙏🙏🙏

[08:41, 13/06/2024] Azman HKL: 1. 8th floor. Request to continue joint inspection electrical services at the brick wall. 10am after Pipe inspection. DCC @~s4yamahuk4ya88.gmail.com 
2. 8th floor. Request inspection cable continuity test for smoke detectors. Econmech @~WY 
Request.:@Kadapi J. PROMES @~sam . 

NSC site PIC please stanby during inspection with latest drawing and form. TQ.

[09:32, 13/06/2024] Azman HKL: PN10 inspection



[10:18, 13/06/2024] Azman HKL: SD cable continuity test join inspection.

[10:18, 13/06/2024] Azman HKL: Testing in progress.



[10:34, 13/06/2024] Azman HKL: 10th floor. Consultant comment. Please rectify and make this conduit good before inspection.

[10:34, 13/06/2024] Azman HKL: 10th floor. Make it good.

[10:36, 13/06/2024] Azman HKL: Cek balik semua tu conduit. Pastikan lubang tutup habis. 🙏

[10:40, 13/06/2024] +60 17-866 0355: Ok man

[10:41, 13/06/2024] Azman HKL: Jangan ada tinggal lobang begini. Tutup habis.

[10:43, 13/06/2024] Azman HKL: LSK @~zee ini kasi tutup. Ini archi tidak terima.
[10:45, 13/06/2024] Azman HKL: Confirm construction drawing dulu. Next time tolong kita improve.
[10:45, 13/06/2024] +60 18-960 2589: Bukan point elv ni man

[10:48, 13/06/2024] +60 18-960 2589: ini data dan tv
[10:51, 13/06/2024] Azman HKL: Ok. Untuk makluman semua ya. Ini semu kamu punya pekerja mungkin ada lepas pandang. Supervisor minta tolong pantau pekerja dan tegur mereka kali2. Terutamanya sebelum inspection. Pastikan cek dulu betul2.🙏.


[10:56, 13/06/2024] Azman HKL: Kasi dia pasang cantik melekat begini. 👆

[11:06, 13/06/2024] Azman HKL: 10th floor.

[11:19, 13/06/2024] Azman HKL: 11th floor.

[11:30, 13/06/2024] Azman HKL: 12th floor test.

[14:58, 13/06/2024] Azman HKL: 8th floor. Electrical and ELV point inspection at room wall . Unit 22.

[15:09, 13/06/2024] Azman HKL: Unit 21.

[15:09, 13/06/2024] Azman HKL: Unit 20.

[15:16, 13/06/2024] Azman HKL: Unit 19.

[15:27, 13/06/2024] Azman HKL: Unit 18

[15:36, 13/06/2024] Azman HKL: Unit 17

[15:36, 13/06/2024] Azman HKL: Unit 16

[15:48, 13/06/2024] Azman HKL: Unit 15

[15:50, 13/06/2024] Azman HKL: Unit 14.

[15:53, 13/06/2024] +60 16-880 4632: Big gap bottom
[15:54, 13/06/2024] +60 12-559 6863: wait for the St floor screeding done then comment please


NSC GROUP 


[08:31, 13/06/2024] +60 16-832 2597: ⛔️⚠️ To all, ⚠️⛔️
ST06 from Basement ~ 6F will be on Full Lockdown from any access, as screeding and nosing installation is in progress. Take note pls use ST05 or PH to access to any available floor, avoid using ST06. Thank you for your attention.
Cc @Jimmy HKL tlg block off all access ST06 juga Tq

[08:57, 13/06/2024] Azman HKL: Site photo progress.
13/6/24
21st floor. Tower A.

[08:57, 13/06/2024] Azman HKL: 3rd floor. Z8. Slab rebar

[09:01, 13/06/2024] Azman HKL: 7th floor. Column works in progress.

[16:21, 13/06/2024] Azman HKL: SD cable continuity test join inspection.




[16:23, 13/06/2024] Azman HKL: 8th floor. Electrical and ELV point inspection at room wall . Unit 22.


[16:24, 13/06/2024] Azman HKL: @King Hong Office @~WY @~zee man power and working area for today. TQ.🙏