Friday, May 3, 2024

3 MAY 2024 HKL

SITE EG MALL

[09:31, 03/05/2024] Azman HKL: Basement. Ducting inspection in progress.





[10:00, 03/05/2024] +60 16-880 4632: Cement begs were found at L3 
Start harden.not suitable for bricklaying or plastering..QAQC


[10:02, 03/05/2024] Mr. Voo: @~Roxas Ng (Kai) @EG Mall Shafee  plz take action immediately



[14:21, 03/05/2024] +60 16-880 4632: @~Roxas Ng (Kai) @EG Mall Shafee please rectify accordingly.
[14:25, 03/05/2024] +60 16-832 2597: Ok sir

[15:08, 03/05/2024] Azman HKL: CI pipe outlet goes thru MH17 inspection.


NSC GROUP 

[08:15, 03/05/2024] Azman HKL: Site progress photo
3/4/24
21st floor. TA1. Slab formwork in progress. TA2.ift wall and column rebar in progress.

[08:15, 03/05/2024] Azman HKL: 6th floor. TB4. Slab rebar in progress.
6th floor. TB6. Slab formwork in progress.
7th floor. TB5. Slab rebar and M&E in progress.

[09:31, 03/05/2024] Azman HKL: Basement. Ducting inspection in progress.

[10:49, 03/05/2024] Azman HKL: All site NSC PIC reminders. Please do housekeeping the debris and conduit after work. @~Rimon Joseph  @~SayurPakiss @~WY @HIDAYA KH office Num @~s4yamahuk4ya88.gmail.com . Please tolerate other subcon. 🙏🙏🙏
[15:04, 03/05/2024] Azman HKL: CI pipe thru MH17 inspection
 

No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...