[09:07, 29/05/2024] +60 16-832 2597: Wall Level peg inspection at 8F with consultant



[10:40, 29/05/2024] +60 16-832 2597: Site walk random inspection for car park ceiling defect repair


NSC GROUP

[08:24, 29/05/2024] Azman HKL: Site progress photo.
29/5/24.
3rd floor. Z8. Ramp formwork & column in progress

[08:24, 29/05/2024] Azman HKL: 6th floor. TB6. Slab formwork and beam rebar in progress.

[08:35, 29/05/2024] Azman HKL: External Mh. MH12 & MH13 VCP pipe and CI pipe connection in progress.
[08:58, 29/05/2024] Edwin Chen 013: Official?
[09:02, 29/05/2024] Azman HKL: Construction drawing By ID. Official Email by ABLT.
[09:02, 29/05/2024] Edwin Chen 013: Only Type 2?
[09:03, 29/05/2024] Azman HKL: We only received this one.
[09:04, 29/05/2024] +60 12-559 6863: we will forward the email to everyone
[09:04, 29/05/2024] +60 12-559 6863: as per mentioned by ID in last week meeting, they will issue 8 &9 floor full set drawings by 10/06/24

[09:16, 29/05/2024] Azman HKL: 7th floor. TB4. Slab rebar in progress.

[09:27, 29/05/2024] Azman HKL: 15th floor. Lift motor room. Door frame installation in progress.

[09:29, 29/05/2024] Azman HKL: 15th floor. Lift motor room. @~WY cek balik ini slab opening ya. πŸ™πŸ‘†.
[09:30, 29/05/2024] +60 14-379 2990: Okay man..

[09:32, 29/05/2024] Azman HKL: 15th floor. @~WY ini juga ya. Tolong confirm dia. HR. πŸ™

[09:59, 29/05/2024] Azman HKL: 21st floor. Plinth formwork in progress.

[09:59, 29/05/2024] Azman HKL: Water tank plinth.
[10:19, 29/05/2024] Azman HKL: 8th floor. Sample unit. Riser check to install ducting.

[10:21, 29/05/2024] Azman HKL: 8th floor. Riser room painting in progress.

[15:03, 29/05/2024] EG Mall Shafee: Level 8

[15:03, 29/05/2024] EG Mall Shafee: Level 10
[15:07, 29/05/2024] Azman HKL: TQ. @~YoonYK 8,10 mereka clear ya. Itu 10 minta kamu pasang safety netting nanti. Itu simen di 8th floor, nanti mereka siap plaster sana, kami minta pindah jangan depan lift ya.
[15:07, 29/05/2024] +60 19-821 8251: thank you thank you

[15:15, 29/05/2024] Azman HKL: VCP pipe, MH12 to MH13. Casting in progress.


[15:31, 29/05/2024] HIDAYA KH office Num: petang. azman minta tolong buka formwork sini πŸ™πŸΌπŸ™πŸΌ
[15:56, 29/05/2024] Azman HKL: @~Roxas Ng (Kai) tolong atur sama subcon kita. πŸ‘†
[15:57, 29/05/2024] +60 16-832 2597: Alright, saya tlg atur ya
[16:36, 29/05/2024] +60 16-832 2597: @Azman HKL ada org sudah ya
[16:36, 29/05/2024] HIDAYA KH office Num: tqtq πŸ™πŸΌ
[16:37, 29/05/2024] Azman HKL: Bagus @~Roxas Ng (Kai) . Laju πŸ‘πŸ»πŸ‘πŸ»πŸ‘πŸ»
[16:44, 29/05/2024] +60 16-832 2597: Terlampau lagu bikin safety bising saya dah ni πŸ˜…πŸ«£