[09:21, 20/05/2024] Azman HKL: Morning. Kami DCC, Econmech skrg ada di 8th floor.
[09:39, 20/05/2024] Azman HKL: M&E Site walk. 8th floor.
[09:40, 20/05/2024] Azman HKL: Electrical Trunking adjusts resize onsite.
[09:41, 20/05/2024] Azman HKL: Ducting adjust to left near wall.
[09:46, 20/05/2024] Azman HKL: @~Roxas Ng (Kai) minta subcon plaster ini wall. Esok ducting akan start rapat wall.. ππ
[09:47, 20/05/2024] Azman HKL: Re adjust minimum height. Sprinkler and Ducting
[09:52, 20/05/2024] Azman HKL: 2.4
[10:07, 20/05/2024] Azman HKL: 8th floor. Riser room unit 20,21,22. Request wall painting so piping and ducting can proceed. @~Roxas Ng (Kai) π
[10:08, 20/05/2024] +60 16-832 2597: Ok
[10:08, 20/05/2024] +60 16-832 2597: Alright
[10:10, 20/05/2024] Azman HKL: Hose reel at the entrance door.
[10:17, 20/05/2024] Azman HKL: Proposed to shift door. 300 from wall. Center of corridor.
[10:18, 20/05/2024] +60 12-559 6863: need written instruction and mark on drawing
[10:29, 20/05/2024] Azman HKL: Sample unit 21.
[10:32, 20/05/2024] Azman HKL: @~WY rectify as per consultant comment on site.
[10:52, 20/05/2024] Azman HKL: Air fresh duct.
[10:56, 20/05/2024] Azman HKL: Sample shower mixer, 10th floor.
[12:06, 20/05/2024] +60 19-883 0884: Morning tuan..ada sudah update kamu tu quotation LPG Gas dectection Magellan dan Pacific ?
[12:06, 20/05/2024] +60 19-883 0884: kumar already come for site visit tu
NSC GROUP
[07:58, 20/05/2024] Azman HKL: Morning. KH tolong atur ni sambung paip ya ini hari. Ini sudah tolong korek. Kasi atur dia sebelum itu top man hole tutup. π
[08:37, 20/05/2024] Azman HKL: Monday safety toolbox..
[09:23, 20/05/2024] +60 12-559 6863: Dart/Azman, what is this? Aircond exhaust?
[09:31, 20/05/2024] EG MALL ECONMECH Dart: Pressurize
[09:31, 20/05/2024] +60 12-559 6863: exhaust?
[09:31, 20/05/2024] EG MALL ECONMECH Dart: Intake fresh air
[09:31, 20/05/2024] EG MALL ECONMECH Dart: Not exhaust
[09:31, 20/05/2024] +60 12-559 6863: Ok
[09:37, 20/05/2024] +60 12-559 6863: Any openings requirements at ground to 2nd floor shall be further coordinated with fascade & windows. Please get acmv nsc to submit elevation indicating all openings after revised acmv layout as per revised mall layout to be confirm later for further coordination @~π
πΆπ ππ½πππ
[09:38, 20/05/2024] +60 12-559 6863: @EG MALL ECONMECH Dart can provide?
[09:50, 20/05/2024] EG MALL ECONMECH Dart: Can. We submit as shop dwg