18 MAY 2024 HKL

SITE EGB MALL

[16:24, 18/05/2024] Azman HKL: 21st floor. Tower A. Request for M&E inspection tomorrow, Sunday, 19/5/24, 11am. @Kadapi J. PROMES . All NSC site PIC please stand by on site during inspection. @~s4yamahuk4ya88.gmail.com @~WY @~zee @Leung KH🍀 @~YoonYK .
[16:32, 18/05/2024] Kadapi J. PROMES: Ok


NSC GROUP 

[08:27, 18/05/2024] Azman HKL: Site progress photo. 
18/5/24.
21st floor. TA. Slab rebar and M&E in progress.

[08:27, 18/05/2024] Azman HKL: 7th floor. TB4. Beam formwork in progress. TB5. Slab cast. 6th floor. TB6. Lift wall formwork and ST2 RC wall rebar in progress.

[08:27, 18/05/2024] Azman HKL: 2nd floor. Z8.

[08:39, 18/05/2024] Azman HKL: External MH1 & MH2. @HIDAYA KH office Num please liaise with Kinnangland. Already informed Jais and they are willing to help excavate the pipe and work together with them. Please make it a priority. 🙏🙏.

[08:42, 18/05/2024] Azman HKL: External MH19. Pipe connection and backfill

[08:56, 18/05/2024] Azman HKL: Basement water tank @~WY . Tolong check itu scaffolding. Mana satu kamu punya mana HKL punya. Kalau sda tidak pakai tolong buka dia.

[08:57, 18/05/2024] Azman HKL: Ini juga ya.

[09:15, 18/05/2024] Azman HKL: 7th floor. PVC pipe installation in progress.

[09:17, 18/05/2024] +60 14-379 2990: Okay man.

[09:23, 18/05/2024] +60 14-379 2990: Morning.. @Azman HKL minta tolong clear barang depan MDF room.. kami mau pasang pipe 8inch sprinkler alarm valve..
[09:25, 18/05/2024] Azman HKL: Bukan next week ka ko cakap sama saya? Sudah atur orang clear ni tempat esok.
[09:26, 18/05/2024] +60 14-379 2990: Ya. Next week man.. 👍🏻👍🏻 tqvm

[09:51, 18/05/2024] +60 16-832 2597: To NSCs and DSCs that are working at Tower A (L8 and above), please have proper housekeeping works after work.. We try to avoid any unhappy conflict with each other regarding charges on the cleaning issues.. thank you for your understanding cooperation
[09:52, 18/05/2024] Azman HKL: Site PIC please take note.

[09:56, 18/05/2024] Azman HKL: Tolong guna equipment yang betul. Ini bukan platform pijak.
[09:57, 18/05/2024] +60 12-559 6863: Man, NSC tiada scaffolding sendiri kah?
[09:57, 18/05/2024] Azman HKL: @~WY tolong atur.
[09:59, 18/05/2024] Azman HKL: Tdk tau mana dia orang simpan itu scaffolding mereka. NSC tolong ya.

[10:03, 18/05/2024] Jimmy HKL: @~WY atur disebelah tmpt untuk pemasangan ducting nie laluan untuk ke PH2
[10:15, 18/05/2024] +60 14-379 2990: @⁨JIM87 Hkl⁩ minta tolong sketch walkway level 7 or any reference.. supaya kami boleh shift barang2 ducting..tq
[10:23, 18/05/2024] Jimmy HKL: okok boleh

[10:33, 18/05/2024] Azman HKL: Ducting layout inspection. 12th floor.

[11:04, 18/05/2024] Azman HKL: External sewer pipe MH1 - MH2 in progress. Target cast di evening.
[11:11, 18/05/2024] Azman HKL: Azman, get the inspection done by today, Monday morning 7.30am pump on site
[11:14, 18/05/2024] Azman HKL: All NSC please prepare all 21st floor services cast on the slab by tomorrow. I will request. Consultant to coming by Sunday when confirm..
[11:15, 18/05/2024] Azman HKL: I got informed that the pump will be on site ready by 7.30am morning.

[12:09, 18/05/2024] Azman HKL: 21st floor. TA. @~s4yamahuk4ya88.gmail.com please double check box opening position with drawing. Itu box kena sama column dan brick.

[12:11, 18/05/2024] Azman HKL: 21st floor.

[12:11, 18/05/2024] Azman HKL: 20th floor. Tolong double confirm ya
[12:23, 18/05/2024] Azman HKL: Man power and work area. Please submit early.

[14:07, 18/05/2024] Azman HKL: Ini lubang.

[14:58, 18/05/2024] Azman HKL: Adjust on site. @~s4yamahuk4ya88.gmail.com check nanti..👆


[15:22, 18/05/2024] Azman HKL: 21st floor. @~zee ini kamu punya openingmaw ejas juga.

[15:25, 18/05/2024] Azman HKL: DCc sudah pindah mereka punya. Kamu punya box lagi.

 [16:18, 18/05/2024] Azman HKL: I set bsok inspection jam 11am. Tgl ini site clearing lagi dan sikit itu box kasi siap ini hari.

[16:25, 18/05/2024] Azman HKL: @~YoonYK please join kalau dapat. Itu opening lift untuk double check dia..