13 MAY 2024 HKL

 NSC GROUP

[08:22, 13/05/2024] Azman HKL: Site progress photo..
13/5/24
21st floor. TA. Slab rebar and formwork in progress.

[08:22, 13/05/2024] Azman HKL: 6th floor. TB4. Column rebar in progress. TB6. ST RC wall and luft wall rebar in progress. 7th floor. TB7. Slab formwork and rebar in progress.

[08:37, 13/05/2024] Azman HKL: Monday toolbox..

[09:11, 13/05/2024] Azman HKL: Ground floor. MH1-2 excavation in progress.

[09:16, 13/05/2024] Azman HKL: @~ShawnChia @~Leppong incoming MDF pipe di sini bah kan. Minta korek sekali nanti.

[09:32, 13/05/2024] +60 17-866 0355: Ok man

[09:45, 13/05/2024] Azman HKL: 8th floor. Chiller pipe setup and install for sample.

[09:53, 13/05/2024] Azman HKL: 9th floor. Door frame in progress.

[10:52, 13/05/2024] Azman HKL: 11th floor. @~Leppong tolong check dulu ini. Subcon maw tutup itu stiffener.

[13:56, 13/05/2024] Azman HKL: Ground floor. Excavation MH2 in progress.