[09:01, 10/05/2024] +60 16-880 4632: @EG MALL Mr Lo ST6&6A staircase column hit door way...please check the position..
[09:02, 10/05/2024] +60 12-559 6863: Can shift the door?

[10:28, 10/05/2024] Mr. Voo: @~Jacksonsinti  jadi bro ni mcm mana ? Potong tu stiffener kah ? 😅
[10:29, 10/05/2024] EG MALL Mr Lo: Stiffener cannot cut
[10:44, 10/05/2024] +60 13-885 8906: @EG MALL Mr Lo Sudah check ka stiffener position?
[11:22, 10/05/2024] +60 12-559 6863: @~Jacksonsinti please give us a decision what to do next
[11:54, 10/05/2024] +60 13-885 8906: Noted Mr. Raymond. Discussed this at site with Mr. Voo 🙏


 NSC GROUP 

[08:37, 10/05/2024] Azman HKL: Site progress photo.
10/5/24.
21st floor. TA. Slab formwork and support in progress.

[08:37, 10/05/2024] Azman HKL: 7th floor. TB5. Slab rebar and beam formwork in progress.

[08:37, 10/05/2024] Azman HKL: 2nd floor. Z8. Slab rebar in progress.

[08:37, 10/05/2024] Azman HKL: 6th floor. TB6. ST2. RC wall rebar, lift wall rebar and column rebar in progress.
[08:38, 10/05/2024] +60 19-802 0222: @Azman HKL  hv room belum buka lock lagi bro…@~Leppong
[08:38, 10/05/2024] +60 19-802 0222: Ada org plaster mau masuk tu bro…
[08:40, 10/05/2024] +60 17-866 0355: sudah buka bro

[08:41, 10/05/2024] Azman HKL: ST2. Rebar in progress.
[08:44, 10/05/2024] +60 19-802 0222: Ok thank you

[09:27, 10/05/2024] Azman HKL: @~WY TQ sudah pasang itu pipe sleeve. Tapi lain2 sana kasi standby dia di pipe sleeve supaya itu tukang bata boleh kasi letak di bata.

[09:27, 10/05/2024] Azman HKL: Macam ini. Letak saja pipe sleeve di sana. Macam itu King Hong buat.
[09:28, 10/05/2024] Azman HKL: @~WY Itu lubang. Bincang sama tukang bata baik2 ya. Maw tutup balik itu.

[10:08, 10/05/2024] Azman HKL: 8th floor. @EG MALL ECONMECH Dart tolong dulu bubut pasang pipe Chiller. Kita maw sample untuk konsultan & client sebelum ini next meeting. 🙏
[10:11, 10/05/2024] EG MALL ECONMECH Dart: Ok man. 🙏🏼
[10:13, 10/05/2024] Azman HKL: TQ

[13:52, 10/05/2024] Azman HKL: Incoming SESB and JC9C man hole. @~ShawnChia @~Leppong ini drawing kamu yang maw korek kan.
[13:53, 10/05/2024] +60 16-837 8881: Ya Man

[14:00, 10/05/2024] Azman HKL: 2nd floor. Zone 8. Slab formwork and rebar in progress

[14:00, 10/05/2024] Azman HKL: 7th floor. TB5. Slab formwork and rebar in progress.

[14:01, 10/05/2024] Azman HKL: 21st floor. TA. Slab formwork in progress.

[14:04, 10/05/2024] Azman HKL: Ground floor. PN10 pipe connection in progress.