SITE EG MALL
[10:15, 23/04/2024] Kadapi J. PROMES: @HIDAYA KH office Num Have add bracket to make the verticallity in good condition. Tq
[10:15, 23/04/2024] Kadapi J. PROMES: Level 5
[10:16, 23/04/2024] HIDAYA KH office Num: noted boss. installation still in progress. thank you.
[11:32, 23/04/2024] Kadapi J. PROMES: @HIDAYA KH office Num
Not acceptable. Please rectify b 4 they back fillbthe area. Our pipe is lower than the main pipe. As i remind b 4, please request for inspection any permenant servicess b 4 any work final done.
NSC GROUP
[08:36, 23/04/2024] Azman HKL: Good morning.
Site progress photo.
23/4/24.
20th floor. TA1. Column rebar in progress
[08:36, 23/04/2024] Azman HKL: 20th floor, TA2. Lift wall, columns and slab support in progress.
[08:37, 23/04/2024] Azman HKL: 6th floor. TB6. Lift wall, ST2 rebar in progress. Slab support in progress.
[09:07, 23/04/2024] Azman HKL: Outstanding M&E room. HKL will catch up to complete this room, 1 by 1. NSC site PIC please also double check and inform me so we can check together. π
[09:50, 23/04/2024] Azman HKL: 8th floor. Unit 22. Sample unit. As inform. Tunggu dia orang siap tukar pintu dan siap bata dulu baru paip dan ducting opening. @~WY @HIDAYA KH office Num π
[09:52, 23/04/2024] Azman HKL: 9th floor. @EG Mall DC Raman @EG Mall Econmech Walkeryapp Yapi @~zee ini macam mana. Ok sda ka? Kamu ada bincang ka? Kalau ada masalah highlight saya.π
[10:01, 23/04/2024] Azman HKL: 10th floor. @~WY itu pipe sleeve ya. Minta subcon kamucheck semua pasang pipe sleeve. Sini ada yang tiada letak ya.
[10:06, 23/04/2024] +60 14-379 2990: Okay man.
[10:15, 23/04/2024] Azman HKL: @~nas4rie @~Roxas Ng (Kai) @+60 19-802 0222 tolong atur ya sama Joseph atau Joannes untuk. Clearing formwork. ππ5th floor. Electrical riser.
[10:22, 23/04/2024] Azman HKL: 15th floor. TA1. Wiring in progress.
[10:22, 23/04/2024] Azman HKL: 15th floor. Sprinkler pipe in progress.
[10:38, 23/04/2024] Azman HKL: 14th floor. Wiring and sprinkler pipe works in progress.
[13:10, 23/04/2024] Azman HKL: 20th floor. TA2. Slab progress.
[13:10, 23/04/2024] Azman HKL: 20th floor. TA1. Column progress.
[13:10, 23/04/2024] Azman HKL: 6th floor. TB4. Slab formwork. 7th floor. TB5. Slab formwork.
[14:42, 23/04/2024] Azman HKL: Joint inspection. Cast iron pipe outlet to MH20.
[15:35, 23/04/2024] Azman HKL: @~Leppong πbuka formwork. 15th floor.