[10:18, 18/04/2024] Azman HKL: Ground floor. ST5. Ducting grille outlet sample for inspection and comment. @Kadapi J. PROMES @~Johnny . 🙏
[10:20, 18/04/2024] Kadapi J. PROMES: I have no comment. Just make the cement touch up good😊

[11:43, 18/04/2024] Azman HKL: 7th floor. Lounge @~Johnny @Kadapi J. PROMES minimum pipe height, 3.3m from SFL.
[11:52, 18/04/2024] +60 16-880 4632: We have to go true with ID what is the ceiling height...

[12:09, 18/04/2024] Azman HKL: 8th floor. TA. Hotel @Kadapi J. PROMES bos, request joint inspection sini jam 2pm nanti. Ada isu disini. @~s4yamahuk4ya88.gmail.com @~zee @~WY tolong joint ya. 🙏
[12:16, 18/04/2024] +60 18-960 2589: 👌🏻

[13:37, 18/04/2024] Azman HKL: 5th floor. TB6. Request for M&E inspection. 3PM. @Kadapi J. PROMES . NSC site PIC please standby at site during inspection. @~s4yamahuk4ya88.gmail.com @~zee @~WY @HIDAYA KH office Num

[15:28, 18/04/2024] Azman HKL: 5th floor. TB6. M&E inspection in progress.

[16:10, 18/04/2024] Azman HKL: @~ShawnChia @~s4yamahuk4ya88.gmail.com @~WY @~zee please follow as per discussion with consultant on site. 🙏👆
[16:11, 18/04/2024] +60 16-837 8881: 👌🏻👍🏻👍🏻

 NSC GROUP


[08:03, 18/04/2024] Azman HKL: Morning. 
Site progress photo.
18/4/24.
20th floor. TA1. Slab rebar in progress.

[08:03, 18/04/2024] Azman HKL: 5th floor. TB6. Slab rebar and M&E in progress.
[08:07, 18/04/2024] HIDAYA KH office Num: morning. minta kasi siap formwork untuk riser dekat ST-06a tu ya 🙏🏼
[08:08, 18/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com @~WY @HIDAYA KH office Num @~zee cast plan ini hari ya. Tgk itu site condition juga. 🙏
[08:10, 18/04/2024] Azman HKL: @~nas4rie tolong atur nanti, supaya mereka dapat pasang pipe sleeve sebelum besi masuk. 🙏

[09:01, 18/04/2024] Azman HKL: Ground floor. MH19-MH18. Earth excavation in progress.

[09:17, 18/04/2024] Azman HKL: @~WY atur tutup lubang ya. 🙏
[09:17, 18/04/2024] +60 14-379 2990: Okay man.

[09:36, 18/04/2024] Azman HKL: @~WY kalau kamu pasang ducting macam mana itu Chiller maw keluar?🤔
[09:37, 18/04/2024] EG MALL ECONMECH Dart: sy hold sdh tu man
[09:37, 18/04/2024] EG MALL ECONMECH Dart: ada tangga magic kan sna sblh chiller room
[09:40, 18/04/2024] Azman HKL: Basement. @~WY @HIDAYA KH office Num ini pipe. Last time, ini macam ada maw ejas kan.
[09:42, 18/04/2024] HIDAYA KH office Num: yaaa. kasi jalan dulu tu ducting. nanti kami lari pegi siring sikit tu cast iron

[09:42, 18/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com @~WY sini juga ya. Kamu punya cable tray.👆. Ikut yang sdah bincang hari tu. Ingat itu cable tray maw setup dulu sini.

[09:53, 18/04/2024] Azman HKL: @⁨EG Mall Econmech Walkeryapp Yapi⁩ minta cek ini ducting di Basement. Itu Gap maw tutup. Cek MOS untuk ini barang. Ikut arkitek comment. 🙏
[09:53, 18/04/2024] Azman HKL: @~WY @EG MALL ECONMECH Dart  🙏


[11:19, 18/04/2024] Azman HKL: 8th floor. TA. HOTEL. @~s4yamahuk4ya88.gmail.com @~zee @~WY . Cek dulu ini. Coordinate dulu. Kamu dapat jalan trunking ka?
[11:32, 18/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com @~zee 🤔👆

[11:40, 18/04/2024] Azman HKL: 7th floor. Joint inspection. Sanitary pipe and Ducting.

[12:06, 18/04/2024] Azman HKL: 8th floor. Riser room, Unit 22. Hotel. Joint inspection, slab Coring. Plumbing pipe and Ducting.

[13:29, 18/04/2024] Azman HKL: 5th floor. TB6. Slab rebar and M&E in progress.

[13:29, 18/04/2024] Azman HKL: 20th floor. TA. Slab rebar, formwork and M&E in progress.

[14:16, 18/04/2024] Azman HKL: 8th floor. Site coordination. ELV, Electrical and ducting NSC.




[15:27, 18/04/2024] Azman HKL: 5th floor. TB6. M&E inspection in progress.
[15:28, 18/04/2024] EG MALL ECONMECH Dart: @EG MALL Mr Lo forward to me the revised archi roof L7 for kitchen, ahu room 🙏🏼
[16:01, 18/04/2024] Azman HKL: Joint inspection outcome.
1. Ducting to shift in about 50mm. 
2. Clearance for trunking above ducting 50mm. 
3. Option; ELV will be proposed to run expose on the surface. @~ShawnChia @~WY @~zee @~s4yamahuk4ya88.gmail.com

[16:13, 18/04/2024] +60 19-821 8251: Lift lobby and lift shaft still not safe to work ya as there are still debris in front of lift lobby and also plywood inside lift shaft. Kindly inform.
[16:15, 18/04/2024] Azman HKL: What floor?
[16:22, 18/04/2024] Azman HKL: Last night subcon clearing 3rd floor. Tonight they will. Continue.🙏🙏
[16:22, 18/04/2024] +60 19-821 8251: 1st floor
[16:31, 18/04/2024] Azman HKL: Done inspection. @Mr. Voo @~nas4rie please proceed.
[16:31, 18/04/2024] Mr. Voo: 👍🏻