17 APRIL 2024 HKL

SITE EG MALL

[09:18, 17/04/2024] Kadapi J. PROMES: @Azman HKL & KH @HIDAYA KH office Num , this pipe must be incast. Please request for inspection b 4 casting done. Tq
[09:19, 17/04/2024] HIDAYA KH office Num: noted boss.


[10:09, 17/04/2024] Azman HKL: 8th floor. Corridor

[10:09, 17/04/2024] Azman HKL: 8th floor corridor

[10:09, 17/04/2024] Azman HKL: 8th floor corridor.

[10:17, 17/04/2024] Azman HKL: Ground floor. ST5. SPD frame sample. @Kadapi J. PROMES @~Johnny please check and comment if any. πŸ™πŸ‘†
[10:18, 17/04/2024] Kadapi J. PROMES: Wellcome toby from LSK ELV NSC
[10:32, 17/04/2024] +60 10-822 2014: Thanx, hello everyone🀝
[10:49, 17/04/2024] +60 16-880 4632: Arrange for join inspection..
.bring along drawing.
[10:54, 17/04/2024] Kadapi J. PROMES: Timber frame? I think it's better if we can do as we done at previous project.
[10:59, 17/04/2024] Kadapi J. PROMES: Lets Econmech install 
c/w proper damper then only we bring for join inspection. @~WY Please remove the timber.


[11:02, 17/04/2024] Azman HKL: @⁨EG Mall Econmech Walkeryapp Yapi⁩ as per consultant comment and our discussion. Do it first, then we go for second inspection.

NSC GROUP 

[08:35, 17/04/2024] Azman HKL: Site progress photo.
17/04/24.
5th floor. TB6. Slab rebar, formwork and M&E inprogress.

[08:35, 17/04/2024] Azman HKL: 20th floor. TA. Slab formwork, lift wall and column rebar works in progress.

[08:35, 17/04/2024] Azman HKL: 7th floor.

[08:35, 17/04/2024] Azman HKL: 6th floor. Z6 and Z7. Column rebar in progress.
[08:36, 17/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com ini  ST ya. πŸ‘†πŸ™
[08:36, 17/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com sama ini juga. πŸ‘†πŸ™
[08:42, 17/04/2024] Azman HKL: Ground floor. MH20. Formwork in progress.

[09:49, 17/04/2024] Azman HKL: 8th floor. Riser unit 20/21. Wall plaster done. @~WY @HIDAYA KH office Num tolong atur ya sample unit. πŸ™πŸ™

[09:54, 17/04/2024] Azman HKL: Unit 22. @~WY ini sdah kamu bincang sama Joseph kan. Tolong atur ya supaya bata boleh jalan.

[09:58, 17/04/2024] Azman HKL: 8th floor sample unit

[10:02, 17/04/2024] Azman HKL: πŸ‘πŸ»

[10:07, 17/04/2024] Azman HKL: 8th floor. Corridor soffit


[10:07, 17/04/2024] Azman HKL: 8th floor. Corridor.
[10:07, 17/04/2024] Azman HKL: 8th floor Corridor
[13:06, 17/04/2024] Azman HKL: 5th floor. TB6. Slab rebar and M&E in progress.

[13:06, 17/04/2024] Azman HKL: 20th floor. TA. Slab formwork and rebar in progress..

[13:10, 17/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com jangan biar pintu ni terbuka kalau tiada orang didalam. Lock dia. Sementara itu tahan pintu pakai kayu di handle tu. Jangan biar dia terbuka begituπŸ™
[13:59, 17/04/2024] Azman HKL: @~ShawnChia @Recky Econmech @~sklaw3 give me work progress by today. πŸ™
[16:47, 17/04/2024] Azman HKL: @Azman HKL sudah clear di lift besi semua sudah buang
[16:47, 17/04/2024] Azman HKL: @~YoonYK nanti boleh datang cek. πŸ‘†
[16:48, 17/04/2024] +60 19-821 8251: Besok la, sebelum meeting πŸ™


[16:48, 17/04/2024] Azman HKL: 20th floor. Bottom rebar work in progress.
[16:52, 17/04/2024] +60 12-559 6863: target casting 19/04 Friday
[17:11, 17/04/2024] Azman HKL: Work progress. Just double check. Tq. 