Monday, April 1, 2024

02 APRIL 2024 HKL

SITE EG MALL 


[09:43, 02/04/2024] +60 16-880 4632: Door frame installed without fishtail...
ST3 ~L01
[09:47, 02/04/2024] Azman HKL: Joint inspection plumbing  piping services with M&E consultant at 10.30am. 1st floor and 2nd floor. @Kadapi J. PROMES @HIDAYA KH office Num πŸ‘†
[09:52, 02/04/2024] Kadapi J. PROMES: Now
[09:53, 02/04/2024] Kadapi J. PROMES: Hidaya boleh kah sekarang?
[09:56, 02/04/2024] HIDAYA KH office Num: sorry boss. saya mau meeting saya subcon manhole dulu sekarang
[09:59, 02/04/2024] Kadapi J. PROMES: Petang lah




[10:12, 02/04/2024] +60 16-880 4632: @~....@~Roxas Ng (Kai)  Honeycomb & tie rod hole..uneven level parapet wall to make good..prior skim coat..L3
[10:17, 02/04/2024] +60 16-239 9318: Noted boss


[11:12, 02/04/2024] +60 16-880 4632: @~.... @~Roxas Ng (Kai) how to clear construction waste...blocking escape route.
[11:12, 02/04/2024] +60 16-880 4632: Lift Lobby L8 ST06

NSC GROUP 

[8:43 am, 02/04/2024] Azman HKL: Morning. @~ShawnChia @~Leppong @~zee @~WY kelmarin HKL meeting, untuk makluman, 3 hari selepas bata siap pasang, boleh mula potong untuk masuk konduit. Tapi pastikan jaga kualiti dan housekeeping ya. Tidak perlu tunggu tatai.
[8:45 am, 02/04/2024] Azman HKL: Sekiranya konsultan komen atau memo, rujuk saya, Mr. Voo atau Mr. Raymond ya.
[8:45 am, 02/04/2024] +60 16-837 8881: Noted
[8:46 am, 02/04/2024] Azman HKL: Petang ini ada site meeting. 3.30pm @EG MALL ECONMECH Dart @~zee  tolong join ya. πŸ™
[8:49 am, 02/04/2024] EG MALL ECONMECH Dart: ok note

[8:56 am, 02/04/2024] Azman HKL: Site progress photo.
2/4/2024.
19th floor. TA1. Slab cast. 19th floor. TA2. Slab support works in progress.

[8:56 am, 02/04/2024] Azman HKL: 7th floor. TB3. Slab formwork in progress.

[8:56 am, 02/04/2024] Azman HKL: 5th floor. TB6. Slab formwork and support.
[9:21 am, 02/04/2024] +60 18-960 2589: Ok

[9:43 am, 02/04/2024] Azman HKL: Man hole sewer in progress. @HIDAYA KH office Num tolong atur ya kamu punya paip outlet yang masuk Manhole. Liase sama tu Subcon Kinnangland on site.
[9:44 am, 02/04/2024] HIDAYA KH office Num: on progress

[9:58 am, 02/04/2024] Azman HKL: HV room. Bossku, tolong ya push subcon kasi siap ini bilik. Plastering dalam dan pintu. @~.... @~Roxas Ng (Kai) .
[10:02 am, 02/04/2024] Mr. Voo: @Jimmy HKL  itu lubang lubang bekas scaffolding .. minta kasturi buka dan tutup ya .. thxs
[10:03 am, 02/04/2024] Jimmy HKL: okay bos noted

[10:08 am, 02/04/2024] Azman HKL: 3rd floor. Watertank plinth. @~.... @~Roxas Ng (Kai) tolong push subcon kasi siap itu plinth. Tiada org kerja buat sini.

[10:09 am, 02/04/2024] Azman HKL: @~Roxas Ng (Kai) Maw housekeeping ya. Lepas hack ni batu minta subcon kasi bersih..πŸ™πŸ™
[10:12 am, 02/04/2024] +60 12-559 6863: @Azman HKL share dalm group RC

[10:16 am, 02/04/2024] Azman HKL: @~WY @HIDAYA KH office Num sample hotel. 20,21,22. Cek itu semua opening di lantai. Mana perlu hack atau tutup buat segera supaya Brick boleh jalan ya.  Kalau ada masalah tolong inform awal. Kita selesai dia.

[10:18 am, 02/04/2024] Azman HKL: @~Roxas Ng (Kai) ini sample house tolong inform saya di NSC kalau ada kerja M&E sangkut dia. Kasi siap ini bilik riser ya. Kalau pipe sama ducting jalan kita yang susah maw plaster sama cat.

[10:18 am, 02/04/2024] Azman HKL: Ini juga ya. Sample hotel 20,21.. kalau tiada masalah tolong plaster dia. Jangan kasi tinggal.πŸ™πŸ™
[10:19 am, 02/04/2024] +60 16-832 2597: Ok, boleh ada apa² saya info
[10:19 am, 02/04/2024] +60 12-559 6863: Dear all, any works involving hacking of slab kindly inform dan discuss early before u commence ya

[10:21 am, 02/04/2024] Azman HKL: @EG MALL ECONMECH Dart itu tempat vent ducting thru kasi buat dia cepat. Untuk sample. Kita maw tau apa masalah dia cepat. Saya push itu plastering di sini sample unit ya. πŸ™πŸ™.
[10:21 am, 02/04/2024] Azman HKL: Ya bos. Saya habis pusing ini tempat dulu.. πŸ‘Œ
[10:22 am, 02/04/2024] +60 12-559 6863: tingkat berapa dan apa bilik?
[10:22 am, 02/04/2024] Azman HKL: 8th floor. Unit 20,21,22

[10:23 am, 02/04/2024] +60 12-802 8181: Ini 3 units.. sample unit ka?
[10:25 am, 02/04/2024] Azman HKL: 8th floor. Electrical riser room. Clearing, brick work, plastering, painting. Tolong kejar ini bilik. Ini bilik subcon selalu kasi tinggal belakang. @~.... @~Roxas Ng (Kai) tolong2 dulu kita kejar ini bilik juga. πŸ™πŸ™πŸ™

[10:36 am, 02/04/2024] Azman HKL: Site PIC tolong check balik lepas kerja hacking. Pastikan kualiti boleh bagus dan boleh diterima. Guna SIKA atau HKL akan repair dan Backcharge balik. Minta tolong.
[1:52 pm, 02/04/2024] Azman HKL: 19th floor. TA2. Slab support and formwork in progress

[1:52 pm, 02/04/2024] Azman HKL: 7th floor. TB3. Slab formwork in progress.

[1:52 pm, 02/04/2024] Azman HKL: 5th floor. TB6. Slab formwork and support
[2:35 pm, 02/04/2024] Azman HKL: M&E Coordination meeting. 3.30pm ya.




 